Summer Certification Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

PDF 200-301 Study Guide

Page: 51 / 78
Total 1242 questions

Implementing and Administering Cisco Solutions (200-301 CCNA) v1.1 Questions and Answers

Question 201

Which action is taken by the data plane within a network device?

Options:

A.

forwards traffic to the next hop

B.

constructs a routing table based on a routing protocol

C.

provides CLI access to the network device

D.

looks up an egress interface in the forwarding information base

Question 202

Refer to the exhibit.

An engineer assumes a configuration task from a peer Router A must establish an OSPF neighbor relationship with neighbor 172.1.1.1 The output displays the status of the adjacency after 2 hours. What is the next step in the configuration process for the routers to establish an adjacency?

Options:

A.

Configure router A to use the same MTU size as router B.

B.

Set the router B OSPF ID to a nonhost address.

C.

Configure a point-to-point link between router A and router B.

D.

Set the router B OSPF ID to the same value as its IP address

Question 203

A network engineer is configuring a switch so that it is remotely reachable via SSH. The engineer has already configured the host name on the router. Which additional command must the engineer configure before entering the command to generate the RSA key?

Options:

A.

password password

B.

crypto key generate rsa modulus 1024

C.

ip domain-name domain

D.

ip ssh authentication-retries 2

Question 204

Refer to the exhibit.

An IP subnet must be configured on each router that provides enough addresses for the number of assigned hosts and anticipates no more than 10% growth for new hosts. Which configuration script must be used?

A)

B)

C)

D)

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Page: 51 / 78
Total 1242 questions