Big Halloween Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

CCNA 200-301 Passing Score

Page: 29 / 90
Total 1197 questions

Implementing and Administering Cisco Solutions (200-301 CCNA) v1.1 Questions and Answers

Question 113

A network engineer is configuring a new router at a branch office. The router is connected to an upstream WAN network that allows the branch to communicate with the head office. The central time server with IP address 172.24.54.8 is located behind a firewall at the head office. Which command must the engineer configure so that the software clock of the new router synchronizes with the time server?

Options:

A.

ntp master 172.24.54.8

B.

ntp client 172.24.54.8

C.

ntp peer 172.24.54.8

D.

ntp server 172.24.54.8

Question 114

Refer to the exhibit. Which type of JSON data is shown?

Options:

A.

sequence

B.

string

C.

object

D.

Boolean

Question 115

Which Rapid PVST+ feature should be configured on a switch port to immediately send traffic to a connected server as soon as it is active?

Options:

A.

BPDU guard

B.

loop guard

C.

portfast

D.

uplinkfast

Question 116

Refer to the exhibit.

A network engineer is updating the configuration on router R1 to connect a new branch office to the company network R2 has been configured correctly. Which command must the engineer configure so that devices at the new site communicate with the main office?

Options:

A.

ip route 172.25.25 0 255 255 255.0 192.168.2.1

B.

ip route 172.25.25 1 255 255 255 255 g0/1

C.

ip route 172.25.25.0.255.255.255.0.192.168.2.2

Page: 29 / 90
Total 1197 questions