Question 133

Refer to the exhibit.

Which two statements about the routing table of the leaf switch are true? (Choose two.)

Options:

A.

The next hop 10.0.1.14 for route 172.16.99.0/24 is the TEP address of a border leaf in ACI.

B.

172.16.100.0/24 is a BD subnet in ACI.

C.

The next hop 10.0.8.65 for route 10.20.1.0./24 is the TEP address of a border leaf in ACI.

D.

The next hop 10.1.168.95 for route 172.16.100.0/24 is the TEP address of a border leaf in ACI.

E.

10.20.1.0./24 is a BD subnet in ACI.

Question 134

A network administrator is using the Cisco ESA with Cisco AMP to upload files to the cloud for analysis. The network is congested and is affecting communication. How will the Cisco ESA handle any files which need analysis?

Options:

A.

Cisco AMP calculates the SHA-256 fingerprint, caches it, and periodically attempts the upload.

B.

The Cisco ESA immediately makes another attempt to upload the file.

C.

The file is queued for upload when connectivity is restored.

D.

The file upload is abandoned.

Question 135

An engineer must use the Embedded Event Manager to monitor events that occur on a cisco Nexus 9000 series switch. An environment variable needs to be created so that several policies use the monitored events in in their actions. The external email server is represented by IP address 10.10.10.10. which command sets the environment variable?

Options:

A.

N9k2(config)# event manager policy environment mallserver ‘’10.10.10.10’’

B.

N9k2# event manager environment mallserver ‘’10.10.10.10’’

C.

N9k2 (config-apple1)# environment mallserver ‘’10.10.10.10’’

D.

N9k2 (config)# event manager environment mallserver ‘’10.10.10.10’’

Question 136

An engineer must start a software upgrade on a Cisco Nexus 5000 Series Switch during a zone merge. What is the result of this action?

Options:

A.

The zone merge stops.

B.

The zone merge pauses until the upgrade completes

C.

The upgrade stops

D.

The zone merge executes and then the upgrade completes.