Labour Day Special - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

CCNP Data Center 350-601 Syllabus Exam Questions Answers

Page: 29 / 37
Total 489 questions

Implementing Cisco Data Center Core Technologies (DCCOR) Questions and Answers

Question 113

Due to a domain name change at a customer site, a Cisco UCS cluster must be renamed. An engineer must recommend a solution to ensure that the Cisco UCS Manager is available over HTTPS. Which action accomplishes this goal?

Options:

A.

Reinstall the cluster to generate the default key ring certificate

B.

Generate a new default key ring certificate from the Cisco UCS Manager

C.

Reboot the SSO component of the Cisco UCS Manager

D.

Regenerate the default key ring certificate manually

Question 114

An engineer must generate a Cisco UCS Manager backup. The backup should include all logical configuration and contain all system and logical configuration settings. Which backup type should be selected to meet these requirements?

Options:

A.

system configuration

B.

logical configuration

C.

all configuration

D.

full state

Question 115

Refer to the exhibit.

Which action is taken to ensure that the relay agent forwards the DHCP BOOTREQUEST packet to a DHCP server?

Options:

A.

Configure the interface of the DHCP server as untrusted.

B.

Configure the IP address of the DHCP server.

C.

Enable the DHCP relay agent.

D.

Verify the DHCP snooping bindings.

Question 116

An engineer must implement a disaster recovery policy for the Cisco UCS infrastructure. The solution must meet these criteria:

  • The Recovery Point Objective must be 48 hours.
  • The backup must use encrypted transmission.
  • The Recovery Time Objective must be 4 hours.

Which configuration set must be used in the scheduled backup to meet these requirements?

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Page: 29 / 37
Total 489 questions