Labour Day Special - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

Free 350-601 Cisco Updates

Page: 36 / 37
Total 489 questions

Implementing Cisco Data Center Core Technologies (DCCOR) Questions and Answers

Question 141

Refer to the exhibit.

Which statement about the ERSPAN configuration in this environment is true.

Options:

A.

Host A is the source of ERSPAN spanned traffic and host B is the traffic analyzer.

B.

Host B is the source of ERSPAN spanned traffic and host A is the traffic analyzer.

C.

The session number of the source of ERSPAN spanned traffic must have a session ID of 48 for the traffic analyzer to receive the traffic.

D.

The session number of the source of ERSPAN spanned traffic must have a session ID of 47 for the traffic analyzer to receive the traffic.

Question 142

An engineer must implement a Cisco UCS system at a customer site. One of the requirements is to implement SAN boot. The storage system maps the source WWPN to a unique LUN. Which method does Cisco recommend to configure the SAN boot?

Options:

A.

Create a SAN boot policy in which every initiator is mapped to the same target LUN.

B.

Define the vHBAs as bootable and leave the default values on the target definition.

C.

Define the vHBAs as bootable and leave the boot target definition empty.

D.

Create a SAN boot policy in which every initiator is mapped to a different target LUN.

Question 143

An engineer must deploy a Cisco UCS C-Series Server with a single VIC 1455 integrated into a Cisco UCS Manager cluster. Two fiber connections

are available, and the deployment has no fabric extenders. Which set of actions accomplishes this goal?

Options:

A.

Reset the system using Cisco IMC to its factory default settings.

Attach VIC port 1 and 3 to Fabric Interconnects.

B.

Configure VIC attached ports as Uplink ports on fabric interconnects.

Insert 1000Base-T RJ45 SFP in VIC port 1 and 3.

C.

Reset the system using Cisco IMC to its factory default settings.

Insert 1000Base-T RJ45 SFP in VIC port 1 and 3.

D.

Configure VIC attached ports as Uplink ports on fabric interconnects.

Attach VIC port 1 and 3 to Fabric Interconnects.

Question 144

Which two statements describe the process of upgrading an EPLD on a Cisco MUS 9000 Series Switch? (Choose two)

Options:

A.

EPLDs are capable to be upgraded without replacing the hardware

B.

The CPLDs for all the modules on a switch must be upgraded at the same time

C.

An upgrade verification identifies the impact of each EPLD upgrade

D.

EPLDs are only capable to be upgraded to the latest FH. D image

E.

EPLD upgrades are capable to be completed without powering down the module during the upgrade

Page: 36 / 37
Total 489 questions