Summer Certification Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

CCNP Data Center 350-601 Book

Page: 15 / 32
Total 422 questions

Implementing Cisco Data Center Core Technologies v1.1 (350-601 DCCOR) Questions and Answers

Question 57

Refer to the exhibit An engineer must provision a VXLAN deployment The OSPF has already been configured as the underlay protocol All BGP configurations will be performed using the template method The deployment must meet these requirements

    The local update source for leaf switches must be loopback 1

    The router ID must be the local loopback IP address

    The external BGP connections must use a template name

Drag and drop the configuration snippets from the bottom to complete the configuration

Options:

Question 58

An engineer must perform an initial configuration of VXLAN Tunnel End-Point functionality on the Cisco Nexus 9000 Series platform All the necessary features are already enabled on the switch Which configuration set must be used to accomplish this goal?

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Question 59

Refer to the exhibit. An engineer configures FCoE in a newly installed data center Which configuration must be applied to activate VSAN 100 on VFC 100?

Options:

A.

Allow VSAN 100 on interface eth1/12.

B.

Map an FCoE VLAN to VSAN 100.

C.

Configure a VLAN on VFC 100.

D.

Issue the shutdown lan command on VFC 100

Question 60

What is the impact of an electronic programmable logic device upgrade on a Cisco MDS 9000 Series Director Switch with dual supervisors?

Options:

A.

A manual reboot is required for each supervisor.

B.

Nondisruptive upgrades without traffic interruptions can be performed.

C.

The upgrade is aborted if any module is unsupported.

D.

A complete system reboot is triggered.

Page: 15 / 32
Total 422 questions