Summer Certification Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

350-601 Exam Results

Page: 27 / 32
Total 422 questions

Implementing Cisco Data Center Core Technologies v1.1 (350-601 DCCOR) Questions and Answers

Question 105

Which two actions are needed to configure a single Cisco APIC controller for a Cisco ACI fabric for the first time? (Choose two.)

Options:

A.

Register the APIC that is connected to the switch.

B.

Configure the leaf switch where the Cisco APIC is connected, using CLI to allow APIC connectivity.

C.

Register the switches that are discovered through LLDP.

D.

Configure the first Cisco APIC controller.

E.

Register all leaf and spine switches.

Question 106

An engineer must perform a POAP deployment of a Cisco Nexus 9000 Series Switch The switch must automatically receive its software Image and configuration file upon power-on. Also only UDP Is permitted between the Nexus 9000 switch and the server that hosts the Cisco NX-OS system images. Which set of actions completes the configuration?

Options:

A.

Enable option 43Define HTTP transfer protocol.

B.

Enable option 67Define TFTP transfer protocol

C.

Enable option 35.Define HTTP transfer protocol.

D.

Enable option 46Define TFTP transfer protocol.

Question 107

An engineer needs to implement a solution that will provide telemetry of MDS 9000 switches in a SAN fabric. The solution should use Cisco Data Center Network Manager (DCNIM) with SAN insights feature. Which three steps are required to deploy the solution? (Choose Three.)

Options:

A.

Select a target Fabric to be monitored.

B.

Activate ENTERPRISE_PKG license on target switches

C.

Select the target ports to be monitored for telemetry data

D.

Configure name resolution between the devices

E.

Select a target VSAN to be monitored

F.

Activate SAN_ANALYTICS_PKG license on target switches

Question 108

An engineer configures multiple blade servers for OS installation. The requirements are to use the internal HDDs inside the Cisco UCS blade server and for the OS to remain operational even if one of the HDDs is removed for maintenance. Each blade has two internal HDDs. Which two actions must be taken to meet these requirements? (Choose two.)

Options:

A.

Set Enforce vNIC/vHBA/iSCSI Name to disabled

B.

Set the Local Disk Policy Mode to RAID 1.

C.

Set the First Boot Order to be Local LUN.

D.

Set Boot Policy Mode to UEFI

E.

Set the Protect Configuration to enabled

Page: 27 / 32
Total 422 questions