Question 97

An engineer must configure Cisco UCS Manager to accept only HTTPS connections that use TLS 1 2 The cipher security level must be high and the length of the keyring key value must be 2048 bits Drag and drop the code snippets from the right onto the blanks in the code on the left to accomplish these goals Not all commands are used

Options:

Question 98

A network engineer must deploy a configuration backup policy to the Cisco UCS Manager. The file generated from this backup must have a snapshot of the entire system that should be used to restore the system during disaster recovery. The backup file must be transferred insecurely by using the TCP protocol. Which configuration backup settings meet these requirements?

Options:

A.

Type: All Configuration

Protocol: SCP

B.

Type: Logical Configuration

Protocol: SFTP

C.

Type: Full State

Protocol: FTP

D.

Type: System Configuration

Protocol: TFTP

Question 99

An engineer implements an Application Performance Monitoring (APM) solution. The solution runs in a vSphere infrastructure where the vSwitch support for promiscuous mode is disabled for security reasons. As a result, the final implementation must receive a copy of bidirectional traffic to a load balancer that is connected to a Cisco Nexus 93108 Series Switch. The APM solution supports GRE encapsulated traffic. Which configuration must be applied to the switch to meet this requirement?

Options:

A.

interface vlan1

switchport monitor

destination ip 10.1.1.1

exit

monitor session 1 rx

monitor session 1 tx

source interface ethernet1/9

B.

monitor session 1 both

source interface ethernet 1/9

destination interface ethernet 1/12

erspan-id 1

vrf mgmt0

filter vlan 3

no shut

C.

configure terminal

monitor session 1 type erspan-source

erspan-id 1

destination ip 10.1.1.1

source interface ethernet 1/9 both

vrf default

no shut

D.

interface ethernet 1/9

erspan-id 1

monitor session 1 type erspan-source

interface mgmt0

monitor session 1 type erspan-destination

destination ip 10.1.1.1

no shut

Question 100

An engineer must configure a Cisco UCS blade system that is managed by Cisco UCS Manager. All four connected interfaces between the blade system and the fabric interconnects must be used. Additionally, the connectivity must tolerate any link failure between the l/O module and the fabric interconnects. Which action accomplishes these requirements?

Options:

A.

Configure port aggregation with LACP policy set to default

B.

Configure Firmware Auto Sync Server policy to Auto Acknowledge

C.

Configure Link Group Preference to Port Channel.

D.

Configure chassis/FEX discovery pokey action to four links