Question 129

Refer to the exhibit.

An engineer installs a new Cisco UCS B-Series server. The requirement is to install an operating system on a LUN that is provided by the Fibre Channel storage array. Which two steps must be configured in the boot policy to accomplish this goal? (Choose two.)

Options:

A.

Disable Enforce vNIC^HBA/ISCSI Name

B.

Add Local CD/DVD and SAN Boot.

C.

Configure a SAN Boot Target with a WWPN

D.

Set Boot Order to External USB and LAN Boot

E.

Create (SCSI VNlCs and add Local LUN

Question 130

What is a feature of an electronic programmable logic device upgrade on a Cisco MDS 9000 Series Switch?

Options:

A.

Only the modules that are being upgraded are disrupted.

B.

An EPLD upgrade is disruptive on all modules.

C.

The standby supervisor module can perform the upgrade.

D.

An EPLD upgrade is nondisruptive on all modules.

Question 131

An engineer must recover configuration on a Cisco MDS 9000 Series switch from a previous version that was backed up to bootflash and then verify the restoration.

Drag and drop the commands on the left to the correct order on the right.

Options:

Question 132

What is the benefit of adding Cisco HyperFlex Hardware Acceleration Cards to a HyperFlex deployment?

Options:

A.

offline encryption acceleration

B.

increased network throughput

C.

GPU acceleration

D.

Increased compression efficiency