Total 454 questions

LEED AP Building Design + Construction (LEED v5 AP BD+C) Questions and Answers

Question 89

A furniture manufacturer is designing a new line of office chairs and wants to ensure that the products align with circular-economy principles. Which of the following strategies should the manufacturer prioritize to align with the principles of material stewardship?

Options:

A.

Use virgin materials for all chair components to ensure reliability

B.

Implement a take-back program for end-of-life chairs

C.

Source only locally available materials to reduce transportation impacts

Question 90

In new construction projects, EQc4: Resilient Spaces allows designs to earn points from which of the following management modes?

Options:

A.

Seismic risks

B.

Hurricane and tornado risks

C.

Infection risks

Question 91

A hospital certified underLEED V5in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.

The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.

The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.

The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.

The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.

The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.

The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.

Based on the project design and the credit options that the project team may attempt, what is the highest LEED certification level that can be achieved?

Options:

A.

Platinum

B.

Gold

C.

Silver

Question 92

Which of the following strategies is allowed under Energy Atmosphere Credit, Renewable Energy Production, and will help a project achieve Energy Atmosphere Credit, Optimize Energy Performance?

Options:

A.

Install an on-site photovoltaic array

B.

Purchase Green-e certified carbon offsets

C.

Purchase Green-e certified Renewable Energy Certificates (RECs)

D.

Install a ground-source heat pump

Page: 23 / 34
Total 454 questions