LEED AP Building Design + Construction (LEED AP BD+C) Questions and Answers

Question 89

A project team reviews office chairs with a Type III environmental product declaration (EPD) for the five different categories of environmental impact reduction. Which of the following must the chairs demonstrate for product optimization?

Options:

A.

A reduction in at least two categories

B.

A reduction below the industry average in at least three categories

C.

A 5% reduction in all categories

D.

A 10% reduction in GHG emissions and a 10% reduction in at least two other categories

Question 90

In pursuit of the Materials and Resources Credit, Building Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices, which of the following statements is true related to products purchased for temporary use (formwork, bracing and scaffolding) on the project?

Options:

A.

Temporary wood products cannot be included in the calculations

B.

If any temporary wood materials are included in the calculation, all wood materials must be included in the calculation

C.

Only Forest Stewardship Council (FSC)-certified wood materials are included in the calculation; non-certified wood materials contribute to other credits

D.

FSC-certified wood materials purchased for more than one project can be applied to other projects seeking LEED Certification

Question 91

At the time of registering a project in LEED Online, Regional Priority credits are determined based upon the project's

Options:

A.

environmental zone

B.

longitude and latitude

C.

ASHRAE 90.1 - 2010 climate zone

D.

Environmental Protection Agency Phase I Assessment

Question 92

For major renovation and new construction projects, the required energy and water-related system analyses should be the same except for

Options:

A.

site conditions

B.

massing and orientation

C.

plug and process load needs

D.

building envelope performance

Page: 23 / 30