Question 41

Increasing which of the following variables will require an increase in the outdoor airflow rate under Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?

Options:

A.

Supply air velocity

B.

Number of occupants

C.

System ventilation efficiency

D.

Supply air temperature set point

Question 42

When using the Integrative Process, what is the best way for the LEED AP to assess the impact of indoor and outdoor water consumption in a Building Design and Construction project?

Options:

A.

Perform a preliminary water budget analysis before the completion of schematic design

B.

Install permanent metering on both the water sources and the waste water leaving the site

C.

At the completion of schematic design, count the fixtures and apply the maximum flow rate

D.

Estimate consumption by using 20 gal. per day (76 I per day) for each Full Time Equivalent (FTE) scheduled to occupy the building

Question 43

A newly constructed school has installed solar thermal systems and wind turbines on site. To achieve the maximum number of Energy and Atmosphere points, which team members must be included?

Options:

A.

Energy Modeler and Contractor

B.

Construction Manager and Energy Modeler

C.

Energy Modeler and Commissioning (Cx) Agent

D.

Commissioning (Cx) Agent and Facilities Manager

Question 44

Which of the following products must always be included in Materials and Resources credits?

Options:

A.

Faucets

B.

Furniture

C.

Interior Paint

D.

Fire suppression system