Pre-Winter Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Online LEED-AP-BD+C Questions Video

Page: 16 / 33
Total 442 questions

LEED AP Building Design + Construction (LEED v5 AP BD+C) Questions and Answers

Question 61

A new office-building project has implemented several water-saving strategies, achieving a 25% reduction in potable-water consumption through low-flow fixtures, efficient irrigation systems, and related measures. The project has also integrated a rainwater-harvesting system that contributes an additional 10% reduction in potable-water use.

The project team seeks to maximize its points under WEc2: Enhanced Water Efficiency by adopting the Whole-Project Water Use approach. How many total points can the project potentially earn for potable-water reduction, considering its use of alternative water sources?

Options:

A.

3

B.

2

C.

4

Question 62

Massing and orientation in Integrative Process Credit. Integrative Process evaluates how rotating the building 90 degrees affects

Options:

A.

energy loads

B.

lighting levels

C.

ventilation methods

D.

thermal comfort ranges

Question 63

A project team reviews office chairs with a Type III environmental product declaration (EPD) for the five different categories of environmental impact reduction. Which of the following must the chairs demonstrate for product optimization?

Options:

A.

A reduction in at least two categories

B.

A reduction below the industry average in at least three categories

C.

A 5% reduction in all categories

D.

A 10% reduction in GHG emissions and a 10% reduction in at least two other categories

Question 64

A hospital certified underLEED V5in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.

The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.

The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.

The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.

The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.

The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.

The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.

Which LEED v5 rating system is appropriate for this project?

Options:

A.

LEED for New Construction and Major Renovations

B.

LEED for Commercial Interiors

C.

LEED for Healthcare

Page: 16 / 33
Total 442 questions