LEED AP Building Design + Construction (LEED AP BD+C) Questions and Answers

Question 49

Based on the results of a six-hour waste stream study, the project team for a retail project plans to provide dedicated areas for four easily recyclable waste streams: cardboard, plastic, metal and paper. The project is open to the public 10 hours a day, six days a week. Which of the following actions should be the project team's top priority in order to demonstrate the minimum requirements to achieve Materials and Resources Prerequisite,

Storage and Collection of Recyclables?

Options:

A.

Take appropriate measures for the safe collection, storage and disposal of batteries

B.

Make a waste stream projection for the entire year based on the six hours of the waste stream study

C.

Make a waste stream projection for the entire week, based on the six hours of the waste stream study

D.

Extend the waste stream study to cover a representative time period of a minimum of 24 hours to identify the top five recyclable waste streams

Question 50

LEED project boundaries that include multiple similar buildings which are all eligible for certification can be registered as which of the following?

Options:

A.

Batch project

B.

Group project

C.

Master Site project

D.

Neighborhood project

Question 51

A critical factor in determining a project’s eligibility for LTc3: Compact and Connected Development, Option 2. Access to Transit, Path 1. Public Transit Service is the:

Options:

A.

Number of regularly scheduled weekend transit trips available

B.

Accessibility of safe sidewalks and pedestrian pathways

C.

Frequency of on-site shuttle services provided to the transit stop

Question 52

Which approach will contribute to maintaining compliance with Sustainable Sites Credit, Rainwater Management?

Options:

A.

Installing bioretention area

B.

Installing on-site renewable power generation facility

C.

Substituting impervious surface area with high-albedo paving materials

D.

Increase artificial turf on the roof