Pre-Winter Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Pass LEED-AP-BD+C Exam Guide

Page: 17 / 33
Total 442 questions

LEED AP Building Design + Construction (LEED v5 AP BD+C) Questions and Answers

Question 65

Which of the following workforce development training types contributes to earning points under LTc2: Equitable Development, Option 3: Equitable Construction?

Options:

A.

Financial literacy courses provided on-site by a recognized organization or government entity

B.

Safety training workshops conducted monthly for all construction personnel

C.

Wellness programs offered by a recognized organization to workers on-site

Question 66

Which of the following innovation proposals is most likely to be successful to achieve an Innovation Credit?

Options:

A.

Providing an educational program on the environmental and human health benefits of green building practices

B.

Including locked, indoor bicycle storage for 100% of project occupants

C.

Being located next to a 20 mi. (32 km) award-winning bicycle trail

D.

Distributing leaflets to project occupants about available public transit services nearby

Question 67

For WEp1: Water Metering and Reporting, the intent is to identify opportunities to manage future water savings. Water metering should:

Options:

A.

Include total water consumption for potable and alternative water sources

B.

Include submeters for mechanical equipment

C.

Include only indoor water consumption including manufacturing processes

D.

Provide separate data for indoor and outdoor water consumption

Question 68

The Lakeside Resort is a hotel in a rural area located about 60 mi. (96.6 km) from the nearest town, which has a population of 10,500. There are no other towns for over 200 mi. (321.9 km). The surrounding community is largely made up of ranches and federal- and state-owned land.

The project consists of a single building that includes 150 guest rooms, a small restaurant, an indoor pool, conference spaces, event spaces, and six tenant spaces. A lease has been secured for a future spa, gift shop, coffee shop, and tour operator. Two tenant spaces have not yet been leased. The 10-acre property is adjacent to a lake and provides trail access to public lands.

When drawing the LEED boundary for this project, the project team should include all:

Options:

A.

Of the development footprint (parking lots, building, sidewalks, and paths around the property) plus the land extending 100 ft. from the development footprint

B.

Land associated with the project and adjacent areas that include attractions occupants are expected to use

C.

Contiguous land that is associated with the project and supports its typical operations

Page: 17 / 33
Total 442 questions