Pre-Winter Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

LEED-AP-BD+C Questions Bank

Page: 24 / 33
Total 442 questions

LEED AP Building Design + Construction (LEED v5 AP BD+C) Questions and Answers

Question 93

Which item is included in the reuse calculation for Materials and Resources Credit, Building Life-Cycle Impact Reduction?

Options:

A.

Floor decking

B.

Asbestos insulation

C.

Exterior glazing

D.

Plumbing fixtures

Question 94

Which of the following is required in determining the baseline for Water Efficiency Prerequisite, Indoor Water Use Reduction?

Options:

A.

Duration of use

B.

Building floor area

C.

Make and model of fixtures

D.

Proposed design fixture flow rates

Question 95

A Photovoltaic (PV) system was installed on a 35,000 ft2 (3 252 m2) project. What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning (Cx) and Verification?

Options:

A.

No action is necessary as the PV system is not required to be commissioned

B.

The PV system installer should commission his own installations and share the results with the project owner

C.

The Cx agent for the project must conduct or oversee the Cx of the PV system

D.

The building ' s mechanical engineer should commission his own installations and share the results with the project owner

Question 96

How can a facility manager promote both energy efficiency and thermal comfort in a building?

Options:

A.

Survey occupants about their comfort on a regular basis

B.

Avoid overcooling during warmer seasons

C.

Provide a constant temperature setpoint for the year

D.

Ask the cleaning contractor to turn off all of the lights after cleaning

Page: 24 / 33
Total 442 questions