CDCP: EPI Data Centre Exam 2025 Study Guide Pdf and Test Engine

Are you worried about passing the Exin CDCP (Certified Data Centre Professional (CDCP)) exam? Download the most recent Exin CDCP braindumps with answers that are 100% real. After downloading the Exin CDCP exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the Exin CDCP exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the Exin CDCP exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (Certified Data Centre Professional (CDCP)) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA CDCP test is available at CertsTopics. Before purchasing it, you can also see the Exin CDCP practice exam demo.

Certified Data Centre Professional (CDCP) Questions and Answers

Question 1

What needs to be installed in the battery room when using Lithium-ion batteries?

Options:

A.

A battery management system to monitor and prevent unsafe temperatures during charging/discharging.

B.

High capacity air-conditioning equipment since Lithium-ion batteries are sensitive to high temperatures, which can reduce their lifetime.

C.

A proper ventilation system since Lithium-ion batteries produce highly flammable Hydrogen gas during charging.

D.

A proper supply of distilled water.

Buy Now
Question 2

What is the recommended location for the Isolation Transformer in relation to the ICT-Equipment location?

Options:

A.

The isolation transformer should be as close as possible to the ICT equipment but taking into account potential EMF.

B.

The isolation transformer should be as far away as possible to the ICT equipment to avoid potential EMF.

C.

The isolation transformer has to be installed within the power entry point of the building due to electrical code (regulation) requirements.

D.

The isolation transformer should be installed within the rack in which the ICT equipment has been installed.

Question 3

An optical fiber cable comes with the specifications 50/125 um.

What do the numbers represent?

Options:

A.

The first number represents the distance for a 10 Gb/s connection; the second number represents the distance for a 1 Gb/s connection.

B.

The first number represents the diameter of the core; the second number represents the diameter of the cladding in microns.

C.

The first number represents the diameter of the core; the second number represents the actual diameter cable including the buffer and jacket.

D.

The first number represents the required distance to single-phase power cabling; the second number represents the required distance to three-phase cabling.