During an intra-series upgrade from //XR3 to //XR4, which command should the Implementation Engineer run to verify host connectivity before removing the secondary controller?
Once the new Purity firmware has been installed using the pureinstall command, what step is required to commit the new version?
When should the Implementation Engineer run start_ndu controller-ndu to set the HWNDU tunable?
A customer would like to reduce SafeMode settings for retention and eradication with their current policy. How is authorization obtained to make the requested changes?
FlashArray//C and //E models use which flash storage architecture, identifiable by gray tabs on the DirectFlash Module carriers?
A customer has submitted a Pure Engagement Request (PER) / Implementation Workbook (IWB) and the stated array name is "123". What is the issue With this array name?
What are the starter configurations of DFMDs in a Gen 2 DirectFlash Shelf?
When using FA File, where can the Implementation Engineer manage directories?
The customer has completed the installation document and has stated that the proxy server address is “10.24.18.120”. What additional information is required?
An Implementation Engineer is going on site to complete a data pack evacuation and perform a hardware NDU.
At what step should the Implementation Engineer contact support for assistance?
For a new FlashArray installation, a customer's network team has NOT provisioned network ports for management connectivity. How Will this affect the installation process?
What is the the minimum supported capacity requirement for a FlashArray//XL170R5?
An Implementation Engineer is onsite to replace a 22TB data pack with a new 91TB (10 x 9.1TB) data pack in a FlashArray//X90R5 Gen 2. The array is at 90% capacity. It currently has 22TB (10 x 2.2TB) in slots 0-9 and 63TB (14 x 4.5TB) in slots 10-23, configured as two separate write groups.
What is a supported method to proceed with the planned capacity migration?
What is the rack unit height of a FlashArray//XR2/3?
An Implementation Engineer is setting up a customer environment and has specified a number of NTP servers. Which command should the Implementation Engineer run to list the NTP servers that have been configured?
An Implementation Engineer arrives on site to complete a shelf evac. What action must take place before Pure Support can run the completion commands?
An Implementation Engineer is replacing a failing component in a FlashArray//XR4 and must ensure proper service clearance at the front and rear of the array.
What is the required service depth clearance for the front and rear panels of the FlashArray//XR4?
Support requests a powercycle on a newly-installed FlashArray. What is the correct way to perform this action?
How can an Implementation Engineer confirm for the customer that data-at-rest encryption is enabled on a newly installed FlashArray?
Refer to the following output:
Ping Successful with CCM
What does this indicate?
On FlashArray//XL, which slots support a 4-port FC card?
When performing an install on a FlashArray, what step should be taken first?
What is the minimum AC voltage required to operate a FlashArray//X20R4 array?
On FlashArray models that use standard DFMs instead of DFMDs, which NVRAM bays are always populated?
A dark site customer requests an evacuation of SH01 on a FlashArray/M50. What is an appropriate next step?
After completing planned maintenance, what command should the Implementation Engineer run to verify connectivity to Pure services?
After completing an installation, the customer requests to configure replication IP settings. Where in the GUI does the customer need to navigate in order to do this?
An Implementation Engineer is beginning a controller upgrade. Which command should be run to stop Purity?
Which Purity command can be used to validate I/O is balanced across initiators?
Which ports are used by default for replication on a FlashArray//XR4?
A customer has purchased a DirectFlash Shelf, but lacks available space in the same rack as the chassis. There is available space in a rack 6m away. What step should be taken prior to implementation?
During a FlashArray installation, when should the Implementation Engineer run pureinstall on a controller?
An Implementation Engineer performs a controller upgrade. What is the command to check I/O health?
An Implementation Engineer needs to run the puresetup replace procedure on the FlashArray//X during a controller upgrade. Which command should the Implementation Engineer run on the new controller to determine its model?
Which PCI cards must be validated on the Bill of Materials (BOM) to allow an Implementation Engineer to attach a DirectFlash Shelf to a FlashArray//XL130R5?
An Implementation Engineer performs a controller upgrade. What command should the Implementation Engineer run to check I/O health?
Which PCIe slot supports 4-port FC cards on FlashArray//XL?
In a situation where iSCSI cards need to be re-used during a controller upgrade, which is a valid transfer path?
For FlashArray//XL, which PCIe card slot is reserved for control upgrades?
An Implementation Engineer is onsite to install a new DirectFlash Shelf on a FlashArray//XL that does NOT have any installed. There is an I/O card installed and in use on the default slot for the first shelf.
Where should the Implementation Engineer install the PCIe card for connectivity?
Which NVRAM bays are always populated on the FlashArray//XR2/3?
When should a FlashArray support case be opened?
An Implementation Engineer is performing a FlashArray//XR4 to FlashArray//XL upgrade, and is preparing to remove the XR4 CT0 controller. Which command should the Implementation Engineer run to stop Purity after confirming CT0 is the secondary controller?
On a FlashArray//XR20R2/3 Fibre Channel (FC) array, what is the default type and placement of the PCIe FC card?
When using FA File, where can the Implementation Engineer manage directories?
A customer would like to consolidate their SAS shelves and wants to evacuate multiple shelves in parallel. What is a prerequisite for this procedure?
An Implementation Engineer is installing a FlashArray//XR4 and needs to add an extra card to support a second DirectFlash Shelf. What will be the resulting pair of interfaces?
After rebooting a controller, which command should an Implementation Engineer run to verify all the Purity services have started successfully?
Before proceeding with a controller upgrade, phonehome logs must be sent. What command will verify that the logs have been sent?
What is the default FlashArray//XLR5 - FC configuration shipped for new installs?
What is the required PSU wattage for a FlashArray// X70R2/R3 or X90R2/R3 array?
An Implementation Engineer has completed cabling a DirectFlash Shelf (DFS) to the FlashArray.
Which command should the Implementation Engineer run to verify that the cabling was completed correctly?
An Implementation Engineer runs check start validate-array-health before starting a FlashArray//X70R3 to FlashArray//X70R5 HWNDU and receives code 60 alert indicating an unhealthy NVRAM module in CH0.NVB1. What action Should the Implementation Engineer take to resolve this?
A client needs to upgrade Purity on their FlashArray, but is unable to wait for an available upgrade date from support.
What action should the customer take?
What command should the Implementation Engineer run to view NVRAM install and update status?
During an NDU, when is the Implementation Engineer required to install additional NVRAM modules in slots 2 and 3?
After upgrading Purity during a new installation, which command should an Implementation Engineer run to determine what version of Purity will be loaded at the next boot of the FlashArray?
An Implementation Engineer is performing a capacity consolidation on an X50R3.
Which command is needed for the engineer to determine whether the customer’s FlashArray supports SAS Flash Modules?
What is the rack unit height of a FlashArray//XL?
A customer's management network connectivity is NOT available at the time of array deployment.
Which switch should an Implementation Engineer use to avoid those checks during the puresetup flow?
A customer has submitted a Pure Engagement Request (PER) / Implementation Workbook (IWB) and the stated array name is "123".
What is the issue with this array name?
During a deployment, an Implementation Engineer attempts to name a FlashArray corporate Lab-0L, but the array rejects the name. What is the reason for the failure?
What is the maximum number of DirectFlash Shelves supported for FlashArray//XL?
Which PCI cards must be validated on the Bill of Materials (BOM) to allow an Implementation Engineer to attach a DirectFlash Shelf to a FlashArray//XL130R5?
An Implementation Engineer needs to upgrade Purity to version 6.9.2 on a FlashArray. The .ppkg file was too large to fit on a USB stick as a single file and has been copied to the array as two split files.
How should the Implementation Engineer join the files into a single file to be installed?
An Implementation Engineer is getting ready to install four DFMs into a 16-module efficiency bundle and notices that the new modules are DFMDs while the installed modules are DFMs. What should the Implementation Engineer do to get the array using a 20-module Wide write group?
What command should the Implementation Engineer run to configure a proxy?
What slot does a PCIe SAS card need to be installed in a FlashArray//XR2/3?
What command should the Implementation Engineer run to view NVRAM install and update status?
An Implementation Engineer is going on site to complete a data pack evacuation and perform a hardware NDU. At what step should the Implementation Engineer contact support for assistance?