Pre-Summer Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Changed FlashArray-Implementation-Specialist Exam Questions

Pure Certified FlashArray Implementation Specialist (FAIS) Exam Questions and Answers

Question 53

An Implementation Engineer runs check start validate-array-health before starting a FlashArray//X70R3 to FlashArray//X70R5 HWNDU and receives code 60 alert indicating an unhealthy NVRAM module in CH0.NVB1. What action Should the Implementation Engineer take to resolve this?

Options:

A.

Disable the unhealthy NVRAM module and proceed With HWNDU after confirming there is no degraded data.

B.

Reseat the unhealthy NVRAM module, and then verify it is in a healthy status prior to proceeding with the HWNDU.

C.

Proceed with the HWNDU, the //X70 model has a four NVRAM configuration so the array still has redundancy.

Question 54

A client needs to upgrade Purity on their FlashArray, but is unable to wait for an available upgrade date from support.

What action should the customer take?

Options:

A.

Go through the Self-Service upgrade portal on Pure1 Manage and upgrade to the latest Purity version.

B.

Open a ticket with support, download the latest Purity version, copy to a USB flash drive, and run the pureinstall command on each controller.

C.

Log into the Purity CLI, download the latest Purity version, and run the pureinstall command on each controller.

D.

Proceed with the upgrade by executing the purendu procedure start command via the local array GUI.

Question 55

What command should the Implementation Engineer run to view NVRAM install and update status?

Options:

A.

puredrive list

B.

purearray list

C.

purehw list --all

Question 56

During an NDU, when is the Implementation Engineer required to install additional NVRAM modules in slots 2 and 3?

Options:

A.

Upgrading a FlashArray//X50R3 to a FlashArray//X50R4

B.

Upgrading a FlashArray//X50R3 to a FlashArray//X70R4

C.

Upgrading a FlashArray//X70R4 to a FlashArray//X90R4