Spring Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

FAIS FlashArray-Implementation-Specialist Exam Dumps

Pure Certified FlashArray Implementation Specialist (FAIS) Exam Questions and Answers

Question 21

What is the rack unit height of a FlashArray//XR2/3?

Options:

A.

3

B.

4

C.

5

Question 22

An Implementation Engineer is upgrading a FlashArray//X50R3 to an //X50R4. The array has 10 SAS and 10 DirectFlash modules in the chassis. What type of controller is required to complete the upgrade?

Options:

A.

FLASHARRAY//XC50 R4, SE

B.

FLASHARRAY//XC50 R4, NS

C.

FLASHARRAY//XC50 R4

Question 23

After performing a hardware upgrade from an //M20R2 to a //X20R3-EMEZZ, a customer wants to add a Direct Flash Modules data pack to replace the existing SAS Chassis Data Packs (2x 20TB DPs). What extra hardware is required?

Options:

A.

DFM Swing shelf

B.

SAS Swing shelf

C.

4-port ETH card

Question 24

Upon completion of a hardware upgrade activity, which command should be used to unset the maintenance tag?

Options:

A.

purealert tag --cancel

B.

purealert untag --maintenance

C.

purealert --unset