Spring Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Free FlashArray-Implementation-Specialist Questions Attempt

Pure Certified FlashArray Implementation Specialist (FAIS) Exam Questions and Answers

Question 37

During a HWNDU, the Implementation Engineer initializes CT0 and runs health checks. They observe 12 fewer iSCSI connections compared to pre-upgrade results. While reviewing port speed and status, the output shows CT0.ETH14 at 0.00 b/s. What is the first action the Implementation Engineer should take to troubleshoot?

Options:

A.

Swap the SFP from CT0.ETH14 to the unused management port in CT0.ETH5 and re-check port speed.

B.

Ask the customer to verify which hosts have missing paths and have them reboot the affected hosts.

C.

Ensure the SFP in CT0.ETH14 is fully-seated on the array and re-seat if necessary.

Question 38

Which PCI cards must be validated on the Bill of Materials (BOM) to allow an Implementation Engineer to attach a DirectFlash Shelf to a FlashArray//XL130R5?

Options:

A.

FA-XL-200G Ethernet/RoCE 2-Port

B.

FA-XL-100G iSCSI/RoCE 2-Port

C.

FA-XL-100G Ethernet/RoCE 2-Port

Question 39

An Implementation Engineer completes an installation running 6.x and needs to log back into the array to run final health checks. After rebooting the controllers, which user account should the Implementation Engineer use to log in?

Options:

A.

pureuser

B.

puresetup

C.

pureeng

Question 40

An Implementation Engineer is installing a FlashArray//XR4 and needs to add an extra card to support a second DirectFlash Shelf. What will be the resulting pair of interfaces?

Options:

A.

ETH4 and ETH5

B.

ETH6 and ETH7

C.

ETH5 and ETH6