An Implementation Engineer is installing a second DirectFlash Shelf (DFS) on a FlashArray//XR4 controller. How should the Implementation Engineer complete the installation?
Before installing array rails, where should the cage nuts be placed?
An Implementation Engineer is planning to add a DirectFlash Shelf to a FlashArray//XL with an existing DirectFlash Shelf. Which PCIe slot must be used for shelf connectivity?
The Customer’s Implementation Workbook specifies that the SMTP reply is “outlook.microsoft.com:587”. What correction should be made for array initialization to be successful?