Pre-Summer Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

FAIS Changed FlashArray-Implementation-Specialist Questions

Pure Certified FlashArray Implementation Specialist (FAIS) Exam Questions and Answers

Question 13

An Implementation Engineer is onsite to replace a 22TB data pack with a new 91TB (10 x 9.1TB) data pack in a FlashArray//X90R5 Gen 2. The array is at 90% capacity. It currently has 22TB (10 x 2.2TB) in slots 0-9 and 63TB (14 x 4.5TB) in slots 10-23, configured as two separate write groups.

What is a supported method to proceed with the planned capacity migration?

Options:

A.

Add the new datapack into slots CH0.BAY24 - CH0.BAY28 and start the EVAC of the drives in slots 0-9. Install the remaining drives after the EVAC completes.

B.

Install a swing shelf, add the new data pack to the swing shelf, and evacuate the old 22TB (10 x 2.2TB) pack.

C.

Evacuate the drives from slots 0-9 into remaining capacity, then install the new data pack into those slots.

D.

Remove the 22TB data pack instantly and rebuild the missing data onto the new 91TB drives from parity.

Question 14

What is the rack unit height of a FlashArray//XR2/3?

Options:

A.

3

B.

4

C.

5

Question 15

An Implementation Engineer is setting up a customer environment and has specified a number of NTP servers. Which command should the Implementation Engineer run to list the NTP servers that have been configured?

Options:

A.

puredns list --ntpserver

B.

purenetwork list --ntpserver

C.

purearray list --ntpserver

Question 16

An Implementation Engineer arrives on site to complete a shelf evac. What action must take place before Pure Support can run the completion commands?

Options:

A.

Set maintenance tag.

B.

Power off the shelf.

C.

Enable Remote Assist (RA).

D.

Disconnect the SAS or NVMe cables.