Weekend Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

NCSC-Level-1 Exam Dumps : Nutanix Certified Services Consultant (NCSC): Level 1

PDF
NCSC-Level-1 pdf
 Real Exam Questions and Answer
 Last Update: Oct 17, 2025
 Question and Answers: 78
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$25.5  $84.99
NCSC-Level-1 exam
PDF + Testing Engine
NCSC-Level-1 PDF + engine
 Both PDF & Practice Software
 Last Update: Oct 17, 2025
 Question and Answers: 78
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$40.5  $134.99
Testing Engine
NCSC-Level-1 Engine
 Desktop Based Application
 Last Update: Oct 17, 2025
 Question and Answers: 78
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$30  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

Nutanix Certified Services Consultant (NCSC): Level 1 Questions and Answers

Question 1

A consultant needs to verify the make and model of the systems that will be imaged with Foundation. The consultant does not have the Bill of Materials (BOM) available to review.

When should the consultant verify the make and model to prepare for the cluster deployment?

Options:

A.

During the Foundation Process

B.

While conducting the Tech Review Call

C.

Upon arriving on-site

D.

When reviewing the Statement of Work (SOW)

Buy Now
Question 2

A consultant is setting up a new Hyper-V cluster. The customer requirements are as follows:

* VMs should automatically failover to another host if the host crashes

* Host CPU and Memory resources should be evenly balanced

* New VMs should be placed on the host with the most resources available

Which two Hyper-V features can be used to meet the requirements? (Choose two.)

Options:

A.

Performance Resource Optimization

B.

Failover Clustering

C.

High Availability

D.

Distributed Resource Scheduler

Question 3

After imaging the nodes and creating the cluster successfully, the consultant connects the cluster to the customer network. When logging into Prism, the events dashboard is full of errors.

What is causing the issue?

Options:

A.

The cluster was not stopped prior to connecting to the customer network.

B.

The Cluster Virtual IP Address (VIP) was not set up during the process.

C.

Foundation did not create the cluster successfully.

D.

The consultant did not run Nutanix Cluster Check (NCC..