Summer Special - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

Nutanix NCS-Core Exam With Confidence Using Practice Dumps

Exam Code:
NCS-Core
Exam Name:
Nutanix Certified Services Core Infrastructure Professional (NCS-Core 6.8)
Certification:
Vendor:
Questions:
309
Last Updated:
Sep 18, 2025
Exam Status:
Stable
Nutanix NCS-Core

NCS-Core: NCS Professional Exam 2025 Study Guide Pdf and Test Engine

Are you worried about passing the Nutanix NCS-Core (Nutanix Certified Services Core Infrastructure Professional (NCS-Core 6.8)) exam? Download the most recent Nutanix NCS-Core braindumps with answers that are 100% real. After downloading the Nutanix NCS-Core exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the Nutanix NCS-Core exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the Nutanix NCS-Core exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (Nutanix Certified Services Core Infrastructure Professional (NCS-Core 6.8)) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA NCS-Core test is available at CertsTopics. Before purchasing it, you can also see the Nutanix NCS-Core practice exam demo.

Nutanix Certified Services Core Infrastructure Professional (NCS-Core 6.8) Questions and Answers

Question 1

An administrator is supporting a business critical environment and deploys metro availability to achieve a zero data loss configuration. The two clusters are connected by a 1GbE connection. A new workload is going to be deployed to this cluster. This workload requires a sustained 150MB/S of write throughput and 20MB/s of read throughput.

Which change must be made to deploy the workload successfully on this cluster?

Options:

A.

The bandwidth must be increased to support this workload.

B.

The workload must be configured to read at greater than 12.5MB/S.

C.

The replication frequency must be less than 60 minutes.

D.

Zero data loss nearsync must be used to support this workload.

Buy Now
Question 2

A consultant needs to verify the make and model of the systems that will be imaged with Foundation. The consultant does not have the Bill of Materials (BOM) available to review.

When should the consultant verify the make and model to prepare for the cluster deployment?

Options:

A.

During the Foundation Process

B.

While conducting the Tech Review Call

C.

Upon arriving on-site

D.

When reviewing the Statement of Work (SOW)

Question 3

An alert about RX errors on eth2 on a node is reported in the cluster. The administrator logs in to the CVM in question, checks the ping_* files in the data/logs/syststats folder, and notices intermittent ping loss.

The node in question has the following network configuration:

Which action should be used to troubleshoot without disrupting the VMs running on this node?

Options:

A.

Replace the cable from eth2 to the switch

B.

Remove eth3 from br0-up and monitor for new alerts

C.

Check the port on the switch side for any errors

D.

Enable balance-s1b on br0-up and monitor if a problem persists