Month End Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Nutanix NCS-Core Exam With Confidence Using Practice Dumps

Exam Code:
NCS-Core
Exam Name:
Nutanix Certified Services Core Infrastructure Professional (NCS-Core 6.8)
Certification:
Vendor:
Questions:
309
Last Updated:
Apr 30, 2025
Exam Status:
Stable
Nutanix NCS-Core

NCS-Core: NCS Professional Exam 2025 Study Guide Pdf and Test Engine

Are you worried about passing the Nutanix NCS-Core (Nutanix Certified Services Core Infrastructure Professional (NCS-Core 6.8)) exam? Download the most recent Nutanix NCS-Core braindumps with answers that are 100% real. After downloading the Nutanix NCS-Core exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the Nutanix NCS-Core exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the Nutanix NCS-Core exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (Nutanix Certified Services Core Infrastructure Professional (NCS-Core 6.8)) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA NCS-Core test is available at CertsTopics. Before purchasing it, you can also see the Nutanix NCS-Core practice exam demo.

Nutanix Certified Services Core Infrastructure Professional (NCS-Core 6.8) Questions and Answers

Question 1

An administrator needs to forecast infrastructure requirements for a new program and its associated applications. Prior to the projected start of the new program, all existing applications will be decommissioned.

How should the administrator perform this task?

Options:

A.

Check the Disregard Existing Workloads radio button in the Runway scenario.

B.

Check the Disregard Existing Nodes radio button in the Runway scenario.

C.

Add up the recovered workloads and manually remove from the Runway configuration.

D.

Power down the workloads during a maintenance window and run the Capacity Runway.

Buy Now
Question 2

A consultant deploys a four-node VMware ESXi cluster and vCenter server. An HA/DRS cluster is configured for all four nodes. The customer deploys five new VMs on the cluster.

During the knowledge Transfer, a network cable on one node is removed to demonstrate HA and migration of the VMs to another host. In the HA/DRS cluster settings, the VM Restart Priority for all CVMs is set to Disabled. The customer observes warnings that the CVM on the ejected host is no longer powered on.

Which ESXi HA/DRS cluster setting is missing?

Options:

A.

Enable EVC for the cluster.

B.

Disable VM Monitoring on all CVMs.

C.

Disable Automation Level on all CVMs.

D.

Enable Host Monitoring.

Question 3

A consultant needs to verify the make and model of the systems that will be imaged with Foundation. The consultant does not have the Bill of Materials (BOM) available to review.

When should the consultant verify the make and model to prepare for the cluster deployment?

Options:

A.

During the Foundation Process

B.

While conducting the Tech Review Call

C.

Upon arriving on-site

D.

When reviewing the Statement of Work (SOW)