Summer Special - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

CCDE 400-007 Cisco Study Notes

Page: 23 / 25
Total 349 questions

Cisco Certified Design Expert (CCDE v3.1) Questions and Answers

Question 89

Which design benefit of PortFast is true?

Options:

A.

PortFast does not generate a spanning tree topology change when a station on a port is connected or disconnected

B.

PortFast disables spanning tree on the port, which puts the port into the forwarding state immediately after it is connected

C.

PortFast allows small, unmanaged switches to be plugged into ports of access switches without risking switch loops

D.

PortFast detects one-way communications on the physical port, which prevents switch loops

E.

PortFast prevents switch loops that are caused by a unidirectional point-to-point link condition on Rapid PVST+ and MST

F.

PortFast prevents switched traffic from traversing suboptimal paths on the network

Question 90

What is a disadvantage of the traditional three-tier architecture model when east-west traffic between different pods must go through the distribution and core layers?

Options:

A.

Low bandwidth

B.

Security

C.

Scalability

D.

High latency

Question 91

Which two conditions must be met for EIGRP to maintain an alternate loop-free path to a remote network? (Choose two.)

Options:

A.

The Reported Distance from a successor is lower than the local Feasible Distance.

B.

The Reported Distance from a successor is higher than the local Feasible Distance.

C.

The feasibility condition does not need to be met.

D.

The Feasible Distance from a successor is lower than the local Reported Distance.

E.

A feasible successor must be present.

Question 92

A consultant needs to evaluate project management methodologies for a new service deployment on the existing network of a customer. The customer wants to be involved in the end-to-end project progress and be provided with frequent updates. The customer also wants the ability to change the requirements if needed, as the project progresses. Which project management methodology should be used?

Options:

A.

Three principles

B.

Phased

C.

Agile

D.

Waterfall

Page: 23 / 25
Total 349 questions