USGBC LEED-Green-Associate Online Access

LEED Green Associate GAFRE Exam (LEED GA) Questions and Answers

Question 29

Installing permanent water submeters that measure the total potable water use for a building and associated grounds has which of the following benefits?

Options:

A.

Informs the selection of locally adapted plants

B.

Allows facility staff to track water consumption and identify leaks

C.

Increases on-site water retention and infiltration of rainfall into the ground

D.

Reduces the amount of water needed to support industrial and process systems

Question 30

Light trespass beyond the project boundary can be prevented by the use of

Options:

A.

flood light fixtures

B.

up-lighting fixtures

C.

shielded light fixtures

D.

increasing the number of light fixtures

Question 31

When the project team develops the project and building construction budget, which of the following should be incorporated?

Options:

A.

Green power purchased from the local power company

B.

Time in the schedule for unique materials and systems

C.

Contingency allowances for additional research and analysis of options

D.

The future environmental impact of building maintenance operations

Question 32

Which of the following is an appropriate way to use non-potable water in a building?

Options:

A.

Using captured stormwater for showering

B.

Using wastewater from a sink for dishwashing

C.

Flushing a toilet with wastewater from bathroom sinks

D.

Incorporating air conditioner process water for washing clothes