Spring Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Pass LEED-Green-Associate Exam Guide

LEED Green Associate GAFRE Exam (LEED GA) Questions and Answers

Question 17

What is the maximum number of occupiable stories for a project to be considered LEED Building Design and Construction Homes and Multifamily Low-rise?

Options:

A.

Two

B.

Three

C.

Four

D.

Five

Question 18

The most efficient way for building users to rate the heating and air-conditioning and other aspects of work spaces is through

Options:

A.

an occupant survey

B.

a meeting with the owner

C.

a facilities manager survey

D.

a meeting with the line manager

Question 19

Materials that would otherwise be discarded but are incorporated into a new building are considered to be

Options:

A.

reused materials

B.

local materials

C.

recycled materials

D.

renewable materials

Question 20

ASHRAE standards are applicable to which of the following LEED categories?

Options:

A.

Sustainable Sites and Energy and Atmosphere

B.

Materials and Resources and Sustainable Sites

C.

Water Efficiency and Indoor Environmental Quality

D.

Energy and Atmosphere and Indoor Environmental Quality