Weekend Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

PDD Leak Questions

Page: 3 / 8
Total 100 questions

ARE 5.0 Project Development and Documentation Exam Questions and Answers

Question 9

In a brick veneer wall, what is the primary purpose of the 2-inch air space between the back of the brick and the sheathing?

Options:

A.

To meet the minimum R-value

B.

Allow for differential movement

C.

Provide space for roof drain piping

D.

Minimize mortar bridging

Question 10

The architect has completed 60% of the construction documents. The owner wants to establish the guaranteed maximum price (GMP) at this point before 100% of the construction documents are complete. Several flooring finish items are still undetermined.

What should be included in the project manual to make sure the contractor has a cost to cover all finishes?

Options:

A.

Contingency of 10% added to the overall construction cost

B.

Schedule of flooring unit prices to be completed by the contractor

C.

Allowance of $30/sq. yd. for floor finishes

D.

Alternate to change broadloom carpet to carpet tile

Question 11

The design of a 10-story residential building features a curtain wall system on all four elevations. Due to diurnal temperature swings in the area, the curtain wall will need a thermal break to prevent the transfer of heat into the building.

Click on the thermal break in the pressure-plate mullion detail.

Options:

Question 12

Refer to the exhibit.

What is the horizontal member indicated by the arrow in the wall-floor assembly?

Options:

A.

Fire block

B.

Girt

C.

Lateral shear plate

D.

Ledger

Page: 3 / 8
Total 100 questions