Question 21

Where is the proper place to put a vapor barrier in a cold climate?

Options:

A.

On the exterior between the metal siding and the sheathing

B.

On the exterior between the framing and the sheathing

C.

On the interior between the gypsum wallboard and the framing

D.

In the cavity of the framing space

Question 22

In which of the following locations in concrete masonry should a control joint be placed?

Options:

A.

At the first course of masonry walls

B.

At each corner of the foundation wall

C.

At changes in wall height

D.

In the center of window openings

Question 23

In coordination of construction documents, heating duct clearances and tolerances in suspended ceiling plenum spaces should be cross-checked with the mechanical engineer and which one of the following?

Options:

A.

HVAC contractor

B.

Electrical contractor

C.

Ceiling manufacturer

D.

Structural engineer

Question 24

During CD phase, the architect notices plumbing lines clash with roof trusses. What should the architect do first?

Options:

A.

Revise the truss design

B.

Notify the contractor

C.

Consult with the plumbing engineer

D.

Add soffits to conceal pipes