HP Related Exams
HPE0-S22 Exam
A customer needs to streamline monitoring for its HPE Apollo 6000 solution.
Which benefit can HPE Advanced Power Management (APM) provide to this customer?
A customer requires a server infrastructure update for its Hadoop HBase solution. The HBase maximum
dataset size will be 120TB.
To host HBase, the architect is planning three HPE Moonshot 1500 chassis fully populated with cartridges.
The populated chassis provide the following in total:
- 135 processors with four 2.9GHz cores each
- 4.23TB RAM
- 64.8TB local storage on SSDs
An aspect of the design is under provisioned and is likely to cause performance to degrade to one-tenth or even one-hundredth of its potential.
How can the architect resolve this problem?
A customer's business critical application server, which is managed by HPE OneView, recovered from an
automatic ASR reboot. HPE Support requests an Active Health System log.
What should the customer use to access the log while the server is online?