Spring Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

300-630 Exam Dumps : Implementing Cisco Application Centric Infrastructure - Advanced (DCACIA)

PDF
300-630 pdf
 Real Exam Questions and Answer
 Last Update: Mar 17, 2026
 Question and Answers: 119 With Explanation
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$28.5  $94.99
300-630 exam
PDF + Testing Engine
300-630 PDF + engine
 Both PDF & Practice Software
 Last Update: Mar 17, 2026
 Question and Answers: 119
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$43.5  $144.99
Testing Engine
300-630 Engine
 Desktop Based Application
 Last Update: Mar 17, 2026
 Question and Answers: 119
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$33  $109.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

Implementing Cisco Application Centric Infrastructure - Advanced (DCACIA) Questions and Answers

Question 1

What are two characteristics of network-centric design in Cisco ACI? (Choose two.)

Options:

A.

There is open communication between EPGs

B.

EPGs are used formicro segmentation

C.

EPGs are different security zones

D.

Applications define the network requirements

E.

A bridge domain has one subnet and one EPG

Buy Now
Question 2

Refer to the exhibit.

Which two sets of actions must be taken to permit subnet 192.168.1.0/24 to communicate with subnet 172.18.1.0/24 using Cisco ACI fabric? (Choose two.)

Options:

A.

Configure 192.168.1.0/24 with scope Export Route Control subnet under L3out_B.

Configure 192.168.1.0/24 with scope External subnet for external EPG under L3out_A.

B.

Configure 172.18.1.0/24 with scope External subnet for external EPG under L3out_A.

Configure 192.168.1.0/24 with scope External subnet for external EPG under L3out_B.

C.

Configure 172.18.1.0/24 with scope Export Route Control subnet under L3out_A.

Configure 172.18.1.0/24 with scope External subnet for external EPG under L3out_B.

D.

Configure 172.18.1.0/24 with scope Export Route Control subnet under L3out_B.

Configure 192.168.1.0/24 with scope External subnet for external EPG under L3out_A.

E.

Configure 192.168.1.0/24 with scope Export Route Control subnet under L3out_A. C

Configure 172.18.1.0/24 with scope External subnet for external EPG under L3out B.

Question 3

Refer to the exhibit.

A company merges three of its departments: CORP. HR. and SERVICES. Currently, the connectivity between departments is achieved by using VRF route leaking. The requirement is to redesign the Cisco ACI networking architecture to communicate between EPGs and BDs from any tenant without configuring contracts or VRF route leaking. Which configuration meets these criteria?

Options:

A.

Implement an enforced VRF in the common tenant and map all required BDs to it.

B.

Configure an enforced VRF in the user tenant and map all required EPGs to it.

C.

Implement an unenforced VRF in the common tenant and map all required BDs to it.

D.

Configure an unenforced VRF in the user tenant and map all required EPGs to it.