Big Halloween Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Adobe AD0-E207 Exam With Confidence Using Practice Dumps

Exam Code:
AD0-E207
Exam Name:
Adobe Analytics Architect Master
Certification:
Vendor:
Questions:
50
Last Updated:
Oct 21, 2025
Exam Status:
Stable
Adobe AD0-E207

AD0-E207: Adobe Analytics Exam 2025 Study Guide Pdf and Test Engine

Are you worried about passing the Adobe AD0-E207 (Adobe Analytics Architect Master) exam? Download the most recent Adobe AD0-E207 braindumps with answers that are 100% real. After downloading the Adobe AD0-E207 exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the Adobe AD0-E207 exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the Adobe AD0-E207 exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (Adobe Analytics Architect Master) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA AD0-E207 test is available at CertsTopics. Before purchasing it, you can also see the Adobe AD0-E207 practice exam demo.

Adobe Analytics Architect Master Questions and Answers

Question 1

A retail company is tracking the following:

• An event for clicks on navigation

• An eVar for navigation items clicked on

• A conversion syntax merchandising eVar tracking navigation as a product finding method (PFM)

The company is in the beginning stages of a site redesign and wants to optimize their navigation system.

Before they can optimize, the company needs to benchmark how effectively their current navigation system brings visitors deeper into the site to find products.

Which metric should the Architect use?

Options:

A.

(Units) -r (orders where Navigation is the PFM)

B.

Navigation click-through rate (Navigation clicks * page views)

C.

Navigation usage rate per visit (Navigation clicks * visits)

D.

(Product Views with Navigation as the PFM) * (Navigation clicks)

Buy Now
Question 2

An Architect advises a site developer to embed the Adobe Launch script in the and to place the data layer before the closing tag of a web page.

During testing, an Adobe Analytics page view call fires successfully. Several Adobe variables are not defined in the call. The embedded Launch script and the data layer are implemented correctly per the Architect's specifications.

What should the Architect do to resolve the issue?

Options:

A.

Move the data layer to before the Adobe Launch script in the .

B.

Move the data layer just before the tag.

C.

Move the data layer to after the Adobe Launch script in the .

D.

Move the data layer just before the tag

Question 3

An Architect has defined the following tracking specifications:

• A userlD variable must be set in the data layer

• The userlD value must be mapped to eVar5

• The userlD value must be used as the Adobe visitor identification method.

The tagging engineer confirms that Adobe Launch is configured as requested.

An Analyst notices that the eVar5 report is not being populated.

The Architect can see that the userlD data object is populated in the data layer after the page loads.

What is causing this problem?

Options:

A.

visitorlD is not available in the data layer when the Adobe Launch rule runs

B.

userlD is not being populated using dynamic variables.

C.

eVar5 is not being populated using dynamic variables.

D.

userlD is not available in the data layer when the Adobe Launch rule runs.