Spring Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Vce CPIM-8.0 Questions Latest

Page: 43 / 45
Total 606 questions

Certified in Planning and Inventory Management (CPIM 8.0) Questions and Answers

Question 169

A lengthy power outage led to unavailability of time critical services resulting in considerable losses. It was determined that a backup electrical generator did not work as intended at the time of the incident due to lack of fuel. What should the security consultant FIRST Investigate?

Options:

A.

Maintenance procedures

B.

Supplier contracts

C.

Failover designs

D.

Product catalogs

Question 170

A company confirms a customer order based on available capacity and inventory, even though the current production plan does not cover the entire order quantity. This situation is an example of what type of order fulfillment policy?

Options:

A.

Assemble-to-order (ATO)

B.

Capable-to-promise (CTP)

C.

Available-to-promise (ATP)

D.

Configure-to-order (CTO)

Question 171

A company has the following production conditions:

    Batch size: 1,000 items

    Processing time: 4 minutes per item

    Setup time: 2 hours

    Utilization: 80%

    Efficiency: 80%

Which of the following actions would result in the work being done in the least amount of time?

Options:

A.

Reduce the processing time for each item to 3.5 minutes.

B.

Increase either utilization or efficiency to 100%.

C.

Increase both utilization and efficiency to 90%.

D.

Eliminate the need for a setup to process the batch.

Question 172

In which of the following situations would you use an X-bar chart?

Options:

A.

Track the number of defects that are found in each unit.

B.

Measure the difference between the largest and the smallest in a sample.

C.

Determine the average value of a group of units.

D.

Estimate a subgroup variation.

Page: 43 / 45
Total 606 questions