Question 5

When is a request for change (RFC) document used?

Options:

A.

when approval is needed to make changes in contracts, equipment, or system design

B.

any time documents, drawings, or samples, are sent to a receiving party

C.

after a change order has been approved and issued

D.

when questions first arise about an aspect of the project

Question 6

What does load limit refer to?

Options:

A.

The maximum wattage capacity of the power supply

B.

The weight rating of a component that should not be exceeded to avoid mounting failure

C.

The permissible weight that can be carried onto a job site

D.

The maximum impedance in a speaker circuit

Question 7

____ is the number of times per second a display - a monitor, television, or projector - will draw the image sent to it.

Options:

A.

Interlaced scanning

B.

Frame rate

C.

Refresh rate

D.

Progressive scanning

Question 8

Which type of control system provides device operation by opening or closing an electrical current or voltage loop?

Options:

A.

IR control

B.

Contact closure

C.

RF control

D.

Serial control