Question 33

You ' ve rebooted s-agg2 in a VSX configuration in an attempt to live-upgrade the cluster, and then you see this condition:

What would be the correct way to live-upgrade the VSX cluster?

Options:

A.

Always reload the primary switch first with the new image.

B.

Use the issu update-software option.

C.

Use vsx update-software option.

D.

Set the VSX to compatibility mode first, before rebooting the secondary switch.

Question 34

What does it mean when an event like the one below is seen on the HPE Aruba Networking CX switch?

2024-04-04T08:35:38.312254+00:00 ICX-Core-1 hpe-vaxd[2167]: Event[701|LOG_INFO|AMM1/1|VSX2 state local up, remote down]

Options:

A.

VSX secondary switch is down.

B.

VSX keepalive has detected that the secondary member is down.

C.

The multichassis LAG 2 interface is down on both switches.

D.

The physical interface of LAG 2 on the secondary VSX member is down.

Question 35

You need to configure BGP on an HPE Aruba Networking switch using AS 65010. What is required when establishing peering with neighboring devices using eBGP AS 65100?

Options:

A.

Use of peer AS 65001

B.

Use of route-reflector

C.

Use of directory connected peer

D.

Use of address-family ipv4 internal

Question 36

You recently made a configuration change on a switch, and shortly afterward, you noticed a spike in CPU utilization in the NAE dashboard. You are concerned that the high CPU could be affecting users. What should you do to restore service as quickly as possible?

Options:

A.

Reboot the switch.

B.

Revert the change.

C.

Disable debug logging.

D.

Pause NAE monitoring.