New Year Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

HPE7-A08 Exam Dumps : HPE Aruba Networking Certified Professional – Switching

PDF
HPE7-A08 pdf
 Real Exam Questions and Answer
 Last Update: Jan 3, 2026
 Question and Answers: 75 With Explanation
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$25.5  $84.99
HPE7-A08 exam
PDF + Testing Engine
HPE7-A08 PDF + engine
 Both PDF & Practice Software
 Last Update: Jan 3, 2026
 Question and Answers: 75
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$40.5  $134.99
Testing Engine
HPE7-A08 Engine
 Desktop Based Application
 Last Update: Jan 3, 2026
 Question and Answers: 75
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$30  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

HPE Aruba Networking Certified Professional – Switching Questions and Answers

Question 1

Refer to the exhibit:

A senior network architect has created the configuration above. You are implementing the setup in Building A and C. The actual fiber distance between the building locations is 200m / 656ft utilizing OM4 cabling.

What needs to be changed in the configuration based on the actual environmental conditions to complete the installation and 7 other CX 6300 VSF stack connections in the future?

Options:

A.

Replace the 25GR optics with 10SR

B.

Replace the 25GR optics with 25LR

C.

Replace the 25GR optics with 10LR

D.

Replace the 25GR optics with 25SR

Buy Now
Question 2

Your network monitoring system has issued a critical alert indicating that the ISL between two VSX core switches is down. What can you determine from the log output below?

Options:

A.

Core-2 has disabled its VSX LAG interfaces.

B.

Keepalive packets are being dropped.

C.

Both switches are forwarding traffic over VSX LAGs.

D.

Downstream switches are not able to forward traffic.

Question 3

Refer to the exhibit:

The primary VSX switch has a DHCP relay configured; however, the secondary switch does not display the DHCP relay configuration in the running configuration.

How can the VSX configuration be changed to have the same config on both nodes?

Options:

A.

On the secondary switch, add vsx-sync ip-helper under VSX configuration.

B.

On the primary switch, add vsx-sync ip-helper under VSX configuration.

C.

On the primary switch, add vsx-sync dhcp-relay under VSX configuration.

D.

On the secondary switch, add vsx-sync dhcp-relay under VSX configuration.