Three UPS5000-E-400Ks from a 2+1 parallel system. Which of the following statements about the parallel system are true?
During the installation of an air conditioner system, which of the following statements are correct about the draining impurities from the refrigerant pipe?
The UPS can generate large leakage currents. A circuit breaker equipped with a residual current device (RCD) is not recommended. If leakage protection is required, consider the leakage current of the UPS and downstream devices.