Question 1

Which three statements are correct about data paths in the SPARC M5-32 server?

Options:

A.

Within a DCU, a CPU talks to another CPU directly by using the coherency switch. The SSB is not needed.

B.

From one DCU to a different DCU, an even talks with only another even (same for odd) and hops to the odd-numbered board, if needed, on the destination DCU.

C.

From one DCU to a different DCU, all CPUs can access all PCIe slots In the destination DCU directly in one hop.

D.

A DCU can communicate data only with other DCUs via the BX ASICs on the SSB.

E.

From one DCU to a different DCU, even CPUs can access ail the odd PCIe slots in the destination DCU directly in one hop.

Question 2

You are working on an problem with DCU1 on a APARC M5-32 system. Which four of the following Memory Units are located in the DCU1?

Options:

A.

CMU#4

B.

CMU#14 D

C.

CMU=6

D.

CMU=7 D

E.

CMU = 5 Z

F.

CMU=8

Question 3

In order for ASR to work on the system, what must the customer have configured?

Options:

A.

ASR Host

B.

ASR Client system

C.

ASR Manager system

D.

NTP

Question 4

A customer with a SPARC M5-32 server believes it is not fully configured and wants to add more CMU boards to the platform. Which option represents ILOM targets that you can use to find out if the platform can accommodate additional CPUs?

Options:

A.

/SP/config/Processors

B.

/Servers/Processors

C.

/System/Processors

D.

/Systems/DCUs

Question 5

There are 16x CMUs and 4x IOUs with up to 4x DCUs in a fully configured SPARC M5-32 server. The core interconnect component is Scalability Switch Board (SSB). How many SSBs can there be in a fully configured server?

Options:

A.

16

B.

4

C.

20

D.

12

Question 6

You need to power down HOST 1 to add additional memory to a CMU. Which command do you execute?

Options:

A.

power -off /HOST1

B.

set keyswitch off /HOSTI

C.

power /HOST1 off

D.

stop /HOSTI

Question 7

During a site visit to a customer who has three SPARC M5-32 platforms, which two actions would you take to confirm each platform serial number?

Options:

A.

Visually check for the chassis serial number label at the front lower left – hand side.

B.

Using the SP on each platform to access the ILOM, run show /system serial_ number.

C.

Visually check for the chassis serial number label at the front upper right-hand side.

D.

Using the SP on each platform to access the ILOM, run show /systemsystem_ identification.

E.

Visually check for the chassis serial number label at the rear, towards the top, in the middle.

Question 8

Your customer says that they have some specific requirements they would like to address in the boot disk layout for their system. In which Enterprise Installation Standars (EIS) document would you note this?

Options:

A.

Site Audit Report

B.

Installation Configuration Plan

C.

Test Procedures Plan

D.

Project Schedule

E.

Operational Handover Document

Question 9

Use of the Enterprise Installation Standards (EIS) methodology provides a way to _________

Options:

A.

Create a framework for tracking improperly installed systems

B.

Produce consistent, high-quality installations

C.

Produce systems optimized for Oracle software departments

D.

Create a framework for tracking properly installed systems

Question 10

You are at a customer site to install some new PCIe cards into their SPARC M5-32 platform. You want to ensure there are no existing issues on the platform before you begin your word. Which command would you run to see details of the existing problems on the platform?

Options:

A.

show /System/Faults

B.

show /Servers/open_ problems

C.

Show /System/0pen_pr0blems

D.

show problems

Question 11

Which three statements are correct about installing DIMMS?

Options:

A.

Be sure that you are properly grounded before inserting the DIMM(s) in the socket(s).

B.

If a DIMM slot LED is lit, press the Fault Remind button to turn off the LED.

C.

When replacing a faulty CMU, you do not need to keep DIMMs in the same locations on thereplacement CMU, because the server has an intelligent load-balance feature.

D.

When you press the DIMM Fault Remind button, the slot for a faulty DIMM is lit.

E.

If a DIMM slot LED is lit, the fault is cleared only by the reset command In JLOM.