Labour Day Special - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

Vce 1z0-489 Questions Latest

Page: 2 / 3
Total 79 questions

SPARC M6-32 and SPARC M5-32 Servers Installation Essentials Questions and Answers

Question 5

There are 16x CMUs and 4x IOUs with up to 4x DCUs in a fully configured SPARC M5-32 server. The core interconnect component is Scalability Switch Board (SSB). How many SSBs can there be in a fully configured server?

Options:

A.

16

B.

4

C.

20

D.

12

Question 6

You need to power down HOST 1 to add additional memory to a CMU. Which command do you execute?

Options:

A.

power -off /HOST1

B.

set keyswitch off /HOSTI

C.

power /HOST1 off

D.

stop /HOSTI

Question 7

During a site visit to a customer who has three SPARC M5-32 platforms, which two actions would you take to confirm each platform serial number?

Options:

A.

Visually check for the chassis serial number label at the front lower left – hand side.

B.

Using the SP on each platform to access the ILOM, run show /system serial_ number.

C.

Visually check for the chassis serial number label at the front upper right-hand side.

D.

Using the SP on each platform to access the ILOM, run show /systemsystem_ identification.

E.

Visually check for the chassis serial number label at the rear, towards the top, in the middle.

Question 8

Your customer says that they have some specific requirements they would like to address in the boot disk layout for their system. In which Enterprise Installation Standars (EIS) document would you note this?

Options:

A.

Site Audit Report

B.

Installation Configuration Plan

C.

Test Procedures Plan

D.

Project Schedule

E.

Operational Handover Document

Page: 2 / 3
Total 79 questions