Summer Special - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

Free and Premium VMware 3V0-32.23 Dumps Questions Answers

Page: 1 / 6
Total 86 questions

Cloud Management and Automation Advanced Design Questions and Answers

Question 1

An architect is designing the authentication and identity management component of a private cloud solution and has gathered the following information from the customer.

Single forest multi-domain Active Directory deployment.

Solution must be highly available.

Which approach can the architect take to achieve this?

Options:

A.

Design Workspace One Access as a single node deployment and configure the service as a Single Active Directory Integrated Windows Authentication directory type.

B.

Design Workspace One Access as a clustered deployment and configure the service as a Single Active Directory Integrated Windows Authentication directory type.

C.

Design Workspace One Access as a clustered deployment and configure the service as an LDAP directory type.

D.

Design Workspace One Access as a single node deployment and configure the service as an Active Directory over LDAP directory type.

Buy Now
Question 2

An architect is responsible for designing the physical deployment of a four-node VMware Aria Operations cluster for a healthcare customer. The following requirements must be met:

vSphere management cluster consists of three nodes

Recovery Time Objective (RTO) of less than 2 hours

Use existing customer backup solution

Which recommendation should the architect make to satisfy the requirements?

Options:

A.

Deploy VMware Aria Operations with both high availability and continuous availability with customer backup and restore capabilities.

B.

Deploy VMware Aria Operations high availability to address unintended disaster recovery with customer backup and restore capabilities.

C.

Deploy VMware Aria Operations continuous availability to address downtime with customer backup and restore capabilities.

D.

Deploy VMware Aria Operations relying on customer backup solution for backup and restore capabilities.

Question 3

Which two design decisions would an architect document as part of the physical design? (Choose two.)

Options:

A.

VMware Aria Operations Remote Collectors will be deployed in each location.

B.

The solution will use VMware Aria Operations Continuous Availability.

C.

Storage replication for VMware Aria Operations Manager will not be enabled.

D.

The VMware Aria Operations analytics cluster will be comprised of three Large nodes.

E.

vSpherereservation will be used to guarantee a 1:1 vCPU to physical core ratio for data nodes

Question 4

What two statements are true about VMware Aria Operations Manager high availability (HA)? (Choose two.)

Options:

A.

To enable HA, you must deploy at least 3 data nodes, plus the primary node.

B.

If the primary node fails, the replica node can take over all functions of the primary node.

C.

With HA. data stored in the primary node is partially backed up on the replica node.

D.

Data collection must be restarted from the administrative interface when the primary node fails.

E.

Upon failure of the primary node, failoverto the replica is automatic.

Question 5

Which recommendation should an architect make when designing a highly available VMware Aria Operations cluster?

Options:

A.

Deploy analytics nodes with the same disk size on storage of the same type.

B.

Set Storage DRS to Fully Automated for all VMware Aria Operations Manager analytics nodes.

C.

If the sizing guideline provides several configurations for the same number of objects, use the configuration which has the greatest number of nodes.

D.

Depending on the size and performance requirements for analytics nodes, apply Storage DRS Affinity rules to ensure that nodes are on same datastores.

Question 6

An architect designed a VMware Aria Operations for Logs cluster for an organization with the following details:

The cluster has 3-nodes with 2 event forwarders sending logs to this cluster.

The VMware Aria Operations for Logs cluster is part of the disaster recovery protection process.

What should be the proper sequence of steps in the Disaster Recovery protection run-book for recovering VMware Aria Operations for Logs cluster?

Options:

A.

1. Restore the worker nodes

2. Restore master node

3. Restore the forwarders

4. Restore any recovered agents

B.

1. Restore the master node

2. Restore worker nodes in any order

3. Restore the forwarders

4. Restore any recovered agents

C.

1. Restore the forwarders

2. Restore worker nodes in any order

3. Restore the master node

4. Restore any recovered agents

D.

1. Restore the master node

2. Restore worker nodes in a specific defined order

3. The forwarders

4. Restore any recovered agents

Question 7

An architect is responsible for reviewing the requirements for an existing Cloud Management solution design.

Which requirement would be considered as a functional requirement?

Options:

A.

Thesolution must support the management of workloads within a public cloud.

B.

The solution must meet a Recovery Time Objective of four hours.

C.

The solution must meet a Recovery Point Objective of one day.

D.

Thesolution must meet a monthly uptime ServiceLevel Agreement of 99.5%.

Question 8

An architect is designing the VMware Aria Operations component of a Cloud Management solution. The following information has been provided by the customer:

The solution must support the monitoring of virtual machines across three physical sites.

The latency between each physical site is less than 10 ms.

The solution must be resilient to a site failure.

The solution should be resilient to a failure within a site.

Which two design decisions should the architect document to meet the requirements? (Choose two.)

Options:

A.

The VMware Aria Operations cluster should be deployed across all sites usinq vSphere Hiqh Availability

B.

The VMware Aria Operations cluster should be deployed across all sites using Continuous Availability

C.

The VMware Aria Operations cluster should be deployed in each site using High Availability

D.

The VMware Aria Operations cluster should be deployed across all clusters usinq vSphere Fault Tolerance

E.

All VMware Aria Operations components should reside on clusters confiqured for vSphere Fault Tolerance

Question 9

A healthcare company has mandated that all IP and DNS entries be allocated from an existing third-party IPAM solution. For auditing purposes, all systems must handle user authentication via the existing open source LDAP directory.

When considering a logical design for this scenario, which is true about the dependency relationships of these systems?

Options:

A.

The IPAM system is an upstream dependency and the LDAP system is a downstream dependency of VMware Aria Automation.

B.

The LDAP system is an upstream dependency and the IPAM system is a downstream dependency of VMware Aria Automation.

C.

Both the IPAM and LDAP systems are external, upstream dependencies of VMware Aria Automation.

D.

Both the IPAM and LDAP systems are external, downstream dependencies of VMware Aria Automation.

Question 10

An architect designs a private cloud environment for an organization. The solution must provide the capability to show pricing(showback) for Virtual Machine based services while being requested by the end user via a self-service portal.

Which Cloud Management product should be integrated with VMware Aria Automation to meet this requirement?

Options:

A.

VMware Aria Operations for Logs

B.

VMware Aria Operations for Applications

C.

VMware Aria Operations for Integrations

D.

VMware Aria Operations

Question 11

A customer is looking at embarking on their cloud journey and automating their infrastructure deployment using the VMware Cloud Management solution.

The CIO’s goal is to optimize expenditures by making sure that the resources are right-sized, reclaimed, and retired.

Which VMware Cloud Management component will help the customer achieve this?

Options:

A.

Aria Operations for Applications

B.

Aria Automation

C.

Aria Operations for Logs

D.

Aria Operations

Question 12

A customer is designing VMware Aria Operations for Logs and wants to leverage their Active Directory. The customer also has the following requirements.

Provide Single Sign-On

Use Active Directory Groups

Which design decision would an architect choose to meet the requirements?

Options:

A.

Integrate VMware Aria Operations for Logs authentication with VMware Aria Suite Lifecycle

B.

Export Active Directory Group information and create the groups locally in VMware Aria Operations for Logs

C.

Integrate VMware Aria Operations for Logs authentication directly with Active Directory

D.

Integrate VMware Aria Operations for Logs authentication with VMware Workspace One Access

Question 13

Following a design review meeting with a customer, a cloud architect needs to update an existing VMware Aria Automation design to address changes in requirements.

The new requirements state:

The solution must continue to operate in the event of a single node failure.

The corporate encryption standard requires all solutions to encrypt data in transit using revocable certificates.

Which two design decision should the architect make to meet the new requirements? (Choose two.)

Options:

A.

The solution will deploy three VMware Aria Automation nodes configured within a cluster using an external load balancer.

B.

The solution will use CA-signed certificates.

C.

The solution will use Self-Signed certificates.

D.

The solution will deploy three VMware Aria Automation nodes configured within a cluster using a DNS CNAME.

E.

The solution will deploy three VMware Aria Automation nodes configured within a cluster using an integrated load balancer.

Question 14

An architect is responsible for creating the design for a Cloud Monitoring solution that will be used to monitor a VMware Software-Defined Data Center.

Which two statements below, provided by the Service Owner, would be considered as non-functional requirements? (Choose two.)

Options:

A.

The solution must support the retention of live data for at least 12 months.

B.

The solution must support a monthly availability target of 99.9%.

C.

The Recovery Time Objective (RTO) of solution is 4 hours.

D.

The solution must be redundant to a minimum of N+1 including during planned maintenance.

E.

The solution must support the monitoring of 1000 virtual machines across two data center locations.

Question 15

Options:

A.

A conceptual model provides a more detailed view of the components and relationships that will be necessary to functionally work and achieve the requirements specified.

B.

A physical design provides detailed specifications of the components and interfaces, including vendor, product, version, and configuration details.

C.

A conceptual model shows the components of a system related to the requirements provided, but in an abstract form.

D.

A logical design provides a more detailed view of the components and relationships that will be necessary to functionally work and achieve the requirements specified.

E.

A physical design shows the components of a system related to the requirements provided, but in an abstract form.

F.

A logical design provides detailed specifications of the components and interfaces, including vendor, product, version, and configuration details.

Question 16

An architect is designing a VMware Aria Automation solution with the following customer requirements:

The solution must be highly available.

The solution must be resilient to a single ESXi host failure.

Which three design decisions would support a customer requirements? (Choose three.)

Options:

A.

Configure a 3-node VMware Identify Manager cluster with an embedded load balancer.

B.

Configure vSphere Distributed Resource Scheduler (DRS) anti-affinity rules for all VMware Aria Automation nodes.

C.

Configure a 3-node VMware Identify Manager cluster with an external load balancer.

D.

Configure a 3-node VMware Aria Automation cluster with an external load balancer.

E.

Configure vSphere Distributed Resource Scheduler (DRS) affinity rules for all VMware Aria Automation nodes.

F.

Configure a 3-node VMware Aria Automation cluster with an embedded load balancer.

Question 17

A design for a Cloud Management solution includes a section that describes the association of VMware Aria Operations solution with a remote collector for the purpose of gathering performance and usage metrics.

Which area of the design would contain that section?

Options:

A.

Physical

B.

Requirements

C.

Logical

D.

Conceptual

Question 18

A customer requests a conceptual model for the Cloud Management solution.

What three selections would be included in a conceptual model? (Choose three.)

Options:

A.

VMware Aria Operations for Logs

B.

Logging

C.

Workspace One Access

D.

Monitoring

E.

VMware Aria Automation

F.

Automation

Question 19

An architect is designing a solution for managing cloud templates as part of a VMware Aria Automation design.

The customer has provided the following requirements:

The solution must use a version control system.

The solution must support the creation and update of VMware Cloud Templates using corporately approved editors.

The solution must automatically synchronize changes to ensure the latest VMware Cloud Template version is always available to deploy.

Which design decision should the architect make to complete the design?

Options:

A.

All VMware Cloud Templates will be stored in an external Git-based repository.

B.

All VMware Cloud Templates will be stored in VMware Aria Lifecycle Manager.

C.

All VMware Cloud Templates will be stored in VMware Aria Lifecycle Manager usingthe Source Control endpoint.

D.

All VMware Cloud Templates will be stored only in VMware Aria Automation Assembler.

Question 20

An architect is responsible for designing a Cloud Management solution for a customer.

Which two constraints should the architect detail in the design for this customer? (Choose two.)

Options:

A.

All management tools must be installed within the Management Zone.

B.

The customer has invested in a third-party configuration management tool and this investment must be protected.

C.

The solution must support the existing VMware Software Defined Data Center, which has recently beenupgraded to VMware vSphere7.

D.

The solution should enable business users to deploy workloads to both the private and public cloud environments.

E.

The solution should enable developers to deploy workloads using REST API.

Question 21

An architect is designing a VMware Aria Cloud Management solution. During the requirements gathering workshop with the customer, the following comments were recorded:

Access to all cloud management tooling must be controlled and audited.

The solution must comply with the company’s ISO 27001 compliance standard.

When creating the design documentation, which design quality should be used to classify the requirements?

Options:

A.

Availability

B.

Manageability

C.

Performance

D.

Security

Question 22

After an organization completed an audit of their vSphere environment, they found that virtual machine deployments weren’t consistent. They weren’t using appropriate vSphere tags, resulting in confusion around who owned what virtual machines. Going forward Aria Automation has been chosen to bring consistency to their deployments and day two management. The organization wants to make sure the resources of each department are tagged appropriately.

Which two options will meet the technical requirements? (Choose two.)

Options:

A.

Create a single project for all departments

B.

Set capability tags in cloud zone

C.

Create a project for each department

D.

Apply tags manually after deployment

E.

Set resource tags in every project

Question 23

Drag and drop each Design Quality from the left into the box corresponding to the correct requirement on the right.

Options:

Question 24

What level of design will contain an automation platform, an operational monitoring platform, and a desktop platform?

Options:

A.

Logical Design

B.

Detailed Design

C.

Physical Design

D.

Conceptual Model

Question 25

A customer wants to protect VMware Aria Suite Lifecycle against data loss. They want to achieve a Recovery Point Objective of six hours and a Recovery Time Objective of one hour.

Which three design decisions should the architect make? (Choose three.)

Options:

A.

Backup the VMware Aria Suite Lifecycle usinga VADP-compatible solution.

B.

Backup team must be able to complete the restoration of VMware Aria Suite Lifecycle in six hours.

C.

Backup the VMware Aria Suite Lifecycle configuration to a remote SFTP server.

D.

Backup team must be able to complete the restoration of VMware Aria Suite Lifecycle in one hour.

E.

Backup must run and complete at least even/ six hours

F.

Backup must run and complete at least every one hour

Page: 1 / 6
Total 86 questions