SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 Questions and Answers

Question 1

Which of the following statements about the planning functions available in SAP ECC is correct?

Options:

A.

Master production scheduling (MPS) refers to preferred planning of important materials.

B.

Material requirements planning (MRP) includes automatic capacity leveling.

C.

Long-term planning (LTP) is a long-term form of forecast planning.

D.

In demand management (DM) material shortage situations are identified and corresponding receipt elements are created.

Question 2

An enterprise based in the US produces an end product that is used with the unit of measure "pound" (LB). The material is now to be marketed in the EU. A prerequisite for this is that the material can be sold with the unit "kilogram" (KG).

What is the easiest way to fulfill this requirement?

Options:

A.

Define a unit of measure group that converts pounds to kilograms in the basic data customizing and assign it to the material master on basic data view 1.

B.

Add a conversion factor for converting pounds to kilograms on basic data view 1 in the material master.

C.

Create a new material with a reference to the original material and assign the metric unit of measure to the new material master.

D.

There is no need to take any action. In this scenario, the conversion of units of measurements is done automatically.

Question 3

Which activity can trigger an automatic availability check for the components of a production order?

Options:

A.

Material staging

B.

Order rescheduling

C.

Order release

D.

Goods receipt for a missing part

Question 4

What do you have to consider regarding ATP checks in SAP ECC that are triggered from customer orders?

Options:

A.

If the ATP check determines non-availability, it then checks in the next step whether timely procurement or production is possible.

B.

The ATP quantity is the available quantity that can be used to confirm incoming customer orders.

C.

An ATP check creates fixed links between customer orders and their confirmed receipts.

D.

The ATP check does not take stocks and receipts into account. It checks consumption of planned independent requirements.

Question 5

Where can you define the valid receivers for production order costs?

Options:

A.

In the costing variant

B.

In the settlement profile

C.

In the valuation variant

D.

In the production scheduling profile

Question 6

You want to use the different options for planning in SAP ECC.

What is the correct sequence of the planning procedures?

Options:

A.

Sales and operations planning -> Demand management -> Long-term planning -> Material requirements planning -> Capacity planning

B.

Demand management -> Sales and operations planning -> Capacity planning -> Long-term planning -> Material requirements planning

C.

Material requirements planning -> Demand management -> Sales and operations planning -> Long-term planning -> Capacity planning

D.

Long-term planning -> Sales and operations planning -> Demand management -> Material requirements planning -> Capacity planning

Question 7

The company you advise wants to control the availability check in so that when a production and/or process order is created, the following receipts or issues are taken into account: planned orders, purchase orders, production orders, reservations, dependent requirements. When the production and/or process order is released, only the stock that is currently freely usable should be taken into consideration. How can you fulfill this request?

Options:

A.

Differentiated assignment of two different checking rules in check control.

B.

Activate the freely usable stock in the scope of check.

C.

Enter an appropriate availability checking group in the material master.

D.

Enter an appropriate availability checking rule in the order type.

Question 8

When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling.

Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?

Options:

A.

Total planning online

B.

Multi-level single-item planning with the "display material list" option

C.

Interactive single-item planning for the delayed assembly

D.

Multi-level single-item planning with the "simulation mode" option

Question 9

Which option for selecting a routing exists when you create a production order?

Options:

A.

Automatic selection of a reference operation set

B.

Manual selection based on settings in the order type-dependent parameters

C.

Automatic selection based on the selection ID in the material master

D.

Manual selection based on the list of routings maintained in the material master

Question 10

Which of the following scheduling types can only be used in capacity planning?

Options:

A.

Midpoint

B.

Forward

C.

Only capacity requirements

D.

Backward

Question 11

An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon should be set equally for all materials by default. However, some materials need to have a different planning horizon.

Which procedure do you recommend for setting the planning horizon?

Options:

A.

Set the planning horizon in the MRP groups in Customizing and store deviant entries in the material masters for the corresponding materials.

B.

Set the planning horizon in the plant parameters in Customizing and store deviant entries in the material masters for corresponding materials.

C.

Set the planning horizon in the MRP groups and assign deviant entries via the plant parameter settings in Customizing.

D.

Set the planning horizon in the plant parameters in Customizing and assign deviant entries via the MRP groups for the corresponding materials.

Question 12

What do you have to consider regarding consumption? (Choose two)

Options:

A.

Consumption takes place on the material level between the planned independent requirements and the planned orders.

B.

Consumption is restructured with the planning run.

C.

Consumption can take place between order reservations and planned independent requirements, depending on the strategy.

D.

Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.

Question 13

In what sequence are the steps of material requirements planning performed in SAP ECC?

Options:

A.

1. Net requirements calculation

2. Lot sizing

3. Determination of the procurement type

4. Scheduling

B.

1. Calculation of safety stock

2. Lot sizing

3. Scheduling

4. Determination of the procurement type

C.

1. Availability check

2. Lot sizing

3. Determination of the procurement type

4. Scheduling

D.

1. Net requirements calculation

2. Lot sizing

3. Scheduling

4. Determination of the procurement type

Question 14

You have maintained planning strategy group 10 (make-to-stock production) in the material master (SAP ECC) of a material. For the coming months, you have planned requirements with requirement type LSF (derived from main strategy 10). Now, you want to change the requirement type from LSF to VSF (in accordance with planning strategy 40, planning with final assembly) for requirements in the existing production plan.

Which of the following scenarios are applicable in this case? (Choose two)

Options:

A.

You can enter the strategy group 40 in the material master, but the requirement type is not changed automatically for existing requirements.

B.

You must change the requirement type for planning strategy 10 to VSF in Customizing. The requirement type for all existing requirements is then changed by the next planning run.

C.

You can change the strategy group from 10 to 40 for the existing production plan in the material master, and the requirement type for all requirements is changed automatically.

D.

You can enter the strategy group 40 in the material master and change the present requirement for the product manually in the production plan.

Question 15

A material was planned in the context of SAP ECC material requirements planning. The MRP controller subsequently processed the material by manually converting a specific planned order into a production order. The MRP controller now accesses the current stock/requirements list and the MRP list for this material and compares these two lists.

What do you have to consider for the two lists at this stage? (Choose two)

Options:

A.

The stock/requirements list was updated the moment it was accessed.

B.

The MRP list displays the production order.

C.

The MRP list has the status "processed".

D.

The stock/requirements list displays the production order.