Certified Data Centre Professional (CDCP) Questions and Answers

Question 21

The termination of the ability of a product to perform its required function can be defined as.

Options:

A.

Failure

B.

Termination

C.

Hindrance

D.

Obstacle

Question 22

Escape route signage should be placed where?

Options:

A.

Only at emergency escape doors

B.

Only at the main entrance of the data centre building

C.

At every door providing a pathway

D.

At every door including riser doors, doors of storage closets etc.

Question 23

When having two non-synchronized power sources, the ATS / STS need to be of the type:

Options:

A.

Break before make.

B.

Make before break.

C.

Both make before break or break before make can be used.

D.

Both an ATS and STS can never handle two non-synchronized sources.

Question 24

How many monitoring points should be used in Temperature Measurement?

Options:

A.

1

B.

2

C.

3

D.

4