Weekend Sale Special - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

CDCP Exam Results

Page: 5 / 5
Total 73 questions

Certified Data Centre Professional (CDCP) Questions and Answers

Question 17

Which one of the following is a device that uses circulating chilled water to remove heat?

Options:

A.

Computer Room Air Handling Unit (CRAH)

B.

Computer Room Air System Unit (CRAS)

C.

Computer Room Air Suspension Unit (CRAS)

D.

Computer Room Air Suppression Unit (CRAS)

Question 18

Which design consideration should be implemented with an Inergen-based fire suppression system?

Options:

A.

Install protective covers around the nozzles to avoid accidental gas dumps.

B.

Install the gas containers (tanks) close to the data centre.

C.

To use Inergen only for fires which are not related to electrical power.

D.

Pressure relief valves are required in the room that needs protection.

Question 19

systems are designed specifically to protect the structure of a building.

Options:

A.

Pro-inert

B.

Inergen

C.

Water sprinkler

D.

Total Flooding

Question 20

Which one of the following is used in Measuring Business Value?

Options:

A.

Regeneration Cost

B.

Scalability

C.

Reliability

D.

Upfront Cost

Page: 5 / 5
Total 73 questions