Total 138 questions

HCIA-Datacom V2.0 Questions and Answers

Question 5

On the network shown in the figure, all switches run STP. All links have a path cost of 20, and SW1 is the root bridge. What is the root path cost (RPC) of SW4?

Options:

A.

20

B.

40

C.

60

D.

80

Question 6

Which of the following phases are required for establishing a connection between an SSH server and an SSH client? (Select all that apply)

Options:

A.

Key exchange

B.

Algorithm negotiation

C.

Version negotiation

D.

User authentication

Question 7

On the network shown in the figure, it is required that interfaces on R1 and R3 are reachable to each other through static routes. When implementing this requirement, there is no need to configure static routes on _____. (Enter a device name in the figure, for example, R1.)

Options:

Question 8

R1 has four static routes, each of which has a reachable next hop. Given this static route configuration, what is the next hop of the route to 20.0.0.0/30 in R1’s routing table?

Options:

A.

10.1.4.2

B.

10.1.2.2

C.

10.1.1.2

D.

10.1.3.2

Page: 2 / 10