On your logical standby database, you specified these rules:
After completion of the weekend batch cycle you attempt to delete the SQL Apply filters:
Which is TRUE regarding the execution of the UNSKIP procedure?
Examine the Data Guard configuration after an accidental switchover to Sheep:
DGMGRL> show configuration;
Configuration - Animals
Protection Mode: MaxAvailability
Databases:
sheep - Primary database
dogs - Logical standby database
cats - Physical standby database (disabled)
ORA-16795: the standby database needs to be re-created
Fast-Start Failover: DISABLED
Configuration Status:
SUCCESS
Which three statements will be true after a switchover to Dogs?
A customer asks you to propose the most appropriate solution for this set of requirements:
We need a disaster recovery solution that enables us to fail over from our production database with zero data loss.
We want to generate reports from the proposed standby database at the same time that it is used for data protection.
Developers may need to test occasionally on a copy of the live database
Which TWO solutions would you recommend?
Which four requirements can be met by deploying a logical standby database?