iSQI Related Exams
CTFL-PT_D Exam
Identify the correspondences between performance measures and metrics (1 -6) and the different environments (A C) in which performance evaluation is needed.
1.Alerts and warnings.
2.Concurrency of usage.
3.Operational processes.
4.Resource utilization.
5.Response time.
6.Throughput of data, transactions, and other units of work performed.
1.Operating environment.
2.Business environment.
3.Technical environment.
SELECT ONE OPTION
Associate each type of performance test (listed from 1 to 5) with part of a description that allows its characterization and/or identification (listed from A to E).
1.Endurance testing
2.Scalability testing
3.Capacity testing
4.Stress testing
5.Concurrency testing
1.Type of testing focused on the ability of a system to meet future efficiency requirements.
2.Type of testing used to evaluate a system's ability to handle reduced availability of resources.
3.Type of testing focused on the stability of the system over a specific time frame.
4.Type of testing used to determine the number of transactions a given system will support while still meeting established performance objectives.
5.Type of testing focused on the impact of situations where specific actions occur simultaneously.
SELECT ONE OPTION
Which ONE of the following mechanisms is used to make the load test represent a load situation in a real production environment?
SELECT ONE OPTION