iSQI Related Exams
CTFL-PT_D Exam
If a performance test is testing the response time of an application to be connected through remote access, which protocol is being used?
SELECT ONE OPTION
If George is testing in order to check the stability of a system for a specific period of time in an operational system context, what type of testing is MOST appropriate?
SELECT ONE OPTION
Associate each type of performance test (listed from 1 to 5) with part of a description that allows its characterization and/or identification (listed from A to E).
1.Endurance testing
2.Scalability testing
3.Capacity testing
4.Stress testing
5.Concurrency testing
1.Type of testing focused on the ability of a system to meet future efficiency requirements.
2.Type of testing used to evaluate a system's ability to handle reduced availability of resources.
3.Type of testing focused on the stability of the system over a specific time frame.
4.Type of testing used to determine the number of transactions a given system will support while still meeting established performance objectives.
5.Type of testing focused on the impact of situations where specific actions occur simultaneously.
SELECT ONE OPTION