Spring Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

CTFL-PT_D Exam Dumps : ISTQB Certified Tester Foundation Level - Specialist Performance Testing

PDF
CTFL-PT_D pdf
 Real Exam Questions and Answer
 Last Update: Mar 15, 2026
 Question and Answers: 40 With Explanation
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$25.5  $84.99
CTFL-PT_D exam
PDF + Testing Engine
CTFL-PT_D PDF + engine
 Both PDF & Practice Software
 Last Update: Mar 15, 2026
 Question and Answers: 40
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$40.5  $134.99
Testing Engine
CTFL-PT_D Engine
 Desktop Based Application
 Last Update: Mar 15, 2026
 Question and Answers: 40
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$30  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

ISTQB Certified Tester Foundation Level - Specialist Performance Testing Questions and Answers

Question 1

If a performance test is testing the response time of an application to be connected through remote access, which protocol is being used?

SELECT ONE OPTION

Options:

A.

MMS.

B.

RTE.

C.

WSCL.

D.

LDAP.

Buy Now
Question 2

If George is testing in order to check the stability of a system for a specific period of time in an operational system context, what type of testing is MOST appropriate?

SELECT ONE OPTION

Options:

A.

Endurance testing.

B.

Capacity testing.

C.

Spike testing.

D.

Load testing.

Question 3

Associate each type of performance test (listed from 1 to 5) with part of a description that allows its characterization and/or identification (listed from A to E).

1.Endurance testing

2.Scalability testing

3.Capacity testing

4.Stress testing

5.Concurrency testing

1.Type of testing focused on the ability of a system to meet future efficiency requirements.

2.Type of testing used to evaluate a system's ability to handle reduced availability of resources.

3.Type of testing focused on the stability of the system over a specific time frame.

4.Type of testing used to determine the number of transactions a given system will support while still meeting established performance objectives.

5.Type of testing focused on the impact of situations where specific actions occur simultaneously.

SELECT ONE OPTION

Options:

A.

1C-2D-3E-4B-5A

B.

1B-2A-3D-4C-5E

C.

1B-2E-3A-4D-5C

D.

1C - 2A - 3D - 4B - 5E