Winter Sale - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

iSQI CTFL-PT_D Exam With Confidence Using Practice Dumps

Exam Code:
CTFL-PT_D
Exam Name:
ISTQB Certified Tester Foundation Level - Specialist Performance Testing
Certification:
Vendor:
Questions:
40
Last Updated:
Dec 10, 2025
Exam Status:
Stable
iSQI CTFL-PT_D

CTFL-PT_D: Performance Testing Exam 2025 Study Guide Pdf and Test Engine

Are you worried about passing the iSQI CTFL-PT_D (ISTQB Certified Tester Foundation Level - Specialist Performance Testing) exam? Download the most recent iSQI CTFL-PT_D braindumps with answers that are 100% real. After downloading the iSQI CTFL-PT_D exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the iSQI CTFL-PT_D exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the iSQI CTFL-PT_D exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (ISTQB Certified Tester Foundation Level - Specialist Performance Testing) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA CTFL-PT_D test is available at CertsTopics. Before purchasing it, you can also see the iSQI CTFL-PT_D practice exam demo.

ISTQB Certified Tester Foundation Level - Specialist Performance Testing Questions and Answers

Question 1

(REFER TO BASE SCENARIO 2): When you refer to Base Scenario 2. you are referring to the description and only the description, without any modification.

Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).

• Natalie should make a presentation to the business stakeholders In order to explain the performance test plan.

Question

Which ONE of the following options contains information that should be included in Natalie's presentation to the business stakeholders?

SELECT ONE OPTION

Options:

A.

A spike test shall be conducted in a test environment equivalent to the production environment. Passengers shall be removed from the production environment, disassociated and imported Into the test environment.

B.

The cost of the spike test will be in line with the budget submitted by the cloud service provider. The test must take place in the planned timeframe and use the disassociation algorithm, that were previously agreed on.

C.

A performance test will be conducted to verify the management applications capability to support simultaneous, i.e concurrent, request peaks. The objective of this test (spike test) is to check that the system will be able to support the operations.

D.

A spike test shall be conducted in the performance test environment set up by the systems manager. Preparation includes installation from the clone of the virtual machine identified for this purpose.

Buy Now
Question 2

In this question, consider that test scripts are generated from a protocol level recording. At the end of the recording, an attempt was made to execute the recorded scripts without any processing, and it was not possible to play them back.

Question

What could be the reason why it is not possible to play back the script?

SELECT ONE OPTION

Options:

A.

The lack of business logic.

B.

The test script has not been correlated.

C.

The length of the script.

D.

The missing Initialization section.

Question 3

Associate each type of performance test (listed from 1 to 5) with part of a description that allows its characterization and/or identification (listed from A to E).

1.Endurance testing

2.Scalability testing

3.Capacity testing

4.Stress testing

5.Concurrency testing

1.Type of testing focused on the ability of a system to meet future efficiency requirements.

2.Type of testing used to evaluate a system's ability to handle reduced availability of resources.

3.Type of testing focused on the stability of the system over a specific time frame.

4.Type of testing used to determine the number of transactions a given system will support while still meeting established performance objectives.

5.Type of testing focused on the impact of situations where specific actions occur simultaneously.

SELECT ONE OPTION

Options:

A.

1C-2D-3E-4B-5A

B.

1B-2A-3D-4C-5E

C.

1B-2E-3A-4D-5C

D.

1C - 2A - 3D - 4B - 5E