Summer Certification Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

CTAL-TAE_V2 Exam Dumps : ISTQB Certified Tester Advanced Level - Test Automation Engineering CTAL-TAE (Syllabus v2.0)

PDF
CTAL-TAE_V2 pdf
 Real Exam Questions and Answer
 Last Update: Aug 2, 2026
 Question and Answers: 40 With Explanation
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$25.5  $84.99
CTAL-TAE_V2 exam
PDF + Testing Engine
CTAL-TAE_V2 PDF + engine
 Both PDF & Practice Software
 Last Update: Aug 2, 2026
 Question and Answers: 40
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$40.5  $134.99
Testing Engine
CTAL-TAE_V2 Engine
 Desktop Based Application
 Last Update: Aug 2, 2026
 Question and Answers: 40
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$30  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

ISTQB Certified Tester Advanced Level - Test Automation Engineering CTAL-TAE (Syllabus v2.0) Questions and Answers

Question 1

You have been tasked with adding the execution of build verification tests to the current CI/CD pipeline used in an Agile project. The goal of these tests is to verify the stability of daily builds and ensure that the most recent changes have not altered core functionality. Currently, the first activity performed as part of this pipeline is the static source code analysis. Which of the following stages in the pipeline would you add the execution of these smoke tests to?

Options:

A.

As a first activity, before performing static source code analysis and before generating the new build

B.

After performing static analysis on the source code and before generating the new build

C.

After deploying the new build to the test environment and before performing more extensive testing

D.

As a final activity, immediately before releasing the new build into production

Buy Now
Question 2

Which of the following practices can be used to specify the active (i.e., actually available) features for each release of the SUT and determine the corresponding automated tests that must be executed for a given release?

Options:

A.

Feature-driven development

B.

The use of feature files

C.

Test-driven development

D.

The use of feature toggles

Question 3

Automated tests at the UI level for a web app adopt an asynchronous waiting mechanism that allows them to synchronize test steps with the app, so that they are executed correctly and at the right time, only when the app is ready and has processed the previous step: this is done when there are no timeouts or pending asynchronous requests. In this way, the tests automatically synchronize with the app's web pages. The same initialization tasks to set test preconditions are implemented as test steps for all tests. Regarding the pre-processing (Setup) features defined at the test suite level, the TAS provides both a Suite Setup (which runs exactly once when the suite starts) and a Test Setup (which runs at the start of each test case in the suite). Which of the following recommendations would you provide for improving the TAS (assuming it is possible to perform all of them)?

Options:

A.

Adopt a manual synchronization with the app’s web pages using hard-coded waits instead of the current automatic synchronization

B.

Implement the initialization tasks aimed at setting the preconditions of the tests within the Test Setup feature at the test suite level

C.

Adopt a manual synchronization with the app’s web pages using dynamic waits via polling instead of the current automatic synchronization

D.

Implement the initialization tasks aimed at setting the preconditions of the tests within the Suite Setup feature at the test suite level