Winter Sale - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

CLSSBB Exam Dumps : Certified Lean Six Sigma Black Belt (CLSSBB)

PDF
CLSSBB pdf
 Real Exam Questions and Answer
 Last Update: Nov 21, 2025
 Question and Answers: 357
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$29.75  $84.99
CLSSBB exam
PDF + Testing Engine
CLSSBB PDF + engine
 Both PDF & Practice Software
 Last Update: Nov 21, 2025
 Question and Answers: 357
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$47.25  $134.99
Testing Engine
CLSSBB Engine
 Desktop Based Application
 Last Update: Nov 21, 2025
 Question and Answers: 357
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$35  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

Certified Lean Six Sigma Black Belt (CLSSBB) Questions and Answers

Question 1

A process using a p-chart has pbar = 0.076 and nbar = 4.86. Find the control limits.

Options:

A.

0.069 and 0.083

B.

0.072 and 0.080

C.

0.040 and 0.112

D.

0.0756 and 0.0764

E.

none of the above

Buy Now
Question 2

An x-bar control chart has been established with control limits of 3.245 and 3.257, n = 5. An engineer collects the following sample and plots the average on the control chart: 3.257, 3,256, 3. 258, 3.259.

Options:

A.

the process is out of control

B.

the process is not out of control

C.

the engineer misused the control chart

D.

the control limits are incorrect

Question 3

The mean of a Poisson distribution is 2.94. Its variance is:

Options:

A.

Not enough information is given

B.

1.71

C.

8.64

D.

74.7

E.

1.31