VMware Related Exams
5V0-21.21 Exam
An architect is currently working with a customer to transform their existing ESXi hosts to vSAN nodes. The customer expressed the following requirements.
• First phase will transform 50% of the hosts to a hybrid vSAN nodes.
• Second phase will transform the remaining 50% hosts to an All-Flash vSAN nodes.
The following constraint exists:
• Each host has a 4-port x 1 GbE network interface.
Which two recommendations should the architect make to align with the customer's requirements? (Choose two.)
A customer has upgraded to vSAN 7, but there is still an existing legacy host which must be removed from the vSAN cluster.
Which three steps must an administrator take to successfully remove this host from the vSAN cluster? (Choose three.)
An architect intends to use the Primary Level of Failures To Tolerate (PFTT) to calculate the minimum number of required hosts for a vSAN cluster.
Which calculation model should be used?