VMware Related Exams
5V0-21.21 Exam
A company has engaged a consultant to upgrade an existing vSAN cluster to vSAN 7.0 U1. The company wants to ensure that the same vSAN process can be used in the future.
During the discovery phase, the consultant found the following information about the existing environment:
* The vCenter Server is currently version 7.0.
* The vSAN Cluster has the following configuration:
- vSAN version: 7.0
- Number of vSAN nodes: 6
- Encryption: enabled
- Deduplication and Compression: enabled
- Fault Domains: 1
- vSAN Capacity Utilization: 60%
* Each vSAN node has the following configuration:
- ESXi version: VMware vSphere 7.0
- CPU: 2 processors, 20 cores
- RAM: 1024GB RAM.
- Disk: 2 Cache SSDs and 6 Capacity SSDs
- Network: 4 x 10GbE
* All current hardware (which is from a single vendor) is listed on the vSAN Compatibility Guide for vSAN 7.
Which three recommendations should the consultant make to ensure that the vSAN cluster upgrade is completed? (Choose three.)
An architect intends to use the Primary Level of Failures To Tolerate (PFTT) to calculate the minimum number of required hosts for a vSAN cluster.
Which calculation model should be used?
An administrator wants to deploy a desktop and application virtualization solution on top of vSAN.
Which VMware product should the administrator install?